I'MMIM Ma.
<br />_ ANCHOR
<br />-
<br />ANCHOR TRENCH
<br />P
<br />P
<br />I
<br />ZOPOSED GE
<br />PROPOSED
<br />EOCOMPOS
<br />LINER
<br />.-
<br />._.. AP
<br />ROXIMATE LOCATION
<br />OF
<br />PROPOSED
<br />i
<br />I
<br />EXI
<br />TING LINER TERMINATION
<br />9508.
<br />9520
<br />TE LOCAT10
<br />OF
<br />I -- —j--- -
<br />,(SEE
<br />NOTE 1 )
<br />EXISTING `LINER TERMI
<br />(SEE NOfE 1).
<br />- - -
<br />(S
<br />--
<br />—_
<br />I
<br />�.......
<br />-4(SEE
<br />NOTES -3r
<br />-4:
<br />E G ING
<br />9500
<br />._ -¢j_
<br />ELEV
<br />i �
<br />- .m
<br />XIMATE
<br />5)
<br />9501
<br />_LOCATIO
<br />ER
<br />� T
<br />I
<br />�(IPSTROING LINT
<br />G WG
<br />OCATION
<br />. BOTT
<br />OF, FOOT(
<br />G
<br />:.
<br />(SEE NOT" 3, 4,' & 5)
<br />B.O.F.
<br />m 948
<br />0'
<br />(SEE, NOTE
<br />3, 4, & 5
<br />! T
<br />TERMINATION
<br />(SEE NOTE 1
<br />EXISTING
<br />N
<br />SEE NOTE 1
<br />oaan
<br />OAR
<br />oanl
<br />FAI
<br />APPRUAY.ftr- LOCATION OF-4
<br />a r • (
<br />•
<br />- OF LINLK
<br />a •
<br />7
<br />SEE • • •• a• ,
<br />DETAIL
<br />0
<br />g
<br />o_
<br />n
<br />952(
<br />96'1l *F
<br />31
<br />v9 F 9500
<br />z a
<br />0
<br />U
<br />W 00, W
<br />N
<br />Z
<br />0— 9480
<br />R O 9470
<br />0 20 40 60 80 100
<br />w DISTANCE, (ft)
<br />z
<br />7
<br />A SECTION A
<br />100
<br />0
<br />954(
<br />952(
<br />i
<br />0-
<br />3 QQy
<br />GT 950(
<br />°I4
<br />U
<br />21
<br />94800
<br />_ ANCHOR
<br />-
<br />ANCHOR TRENCH
<br />P
<br />P
<br />I
<br />ZOPOSED GE
<br />PROPOSED
<br />EOCOMPOS
<br />LINER
<br />.-
<br />._.. AP
<br />ROXIMATE LOCATION
<br />OF
<br />PROPOSED
<br />i
<br />._...
<br />EXI
<br />TING LINER TERMINATION
<br />9508.
<br />9520
<br />TE LOCAT10
<br />OF
<br />I -- —j--- -
<br />,(SEE
<br />NOTE 1 )
<br />EXISTING `LINER TERMI
<br />(SEE NOfE 1).
<br />- - -
<br />(S
<br />--
<br />—_
<br />I
<br />�.......
<br />-4(SEE
<br />NOTES -3r
<br />-4:
<br />E G ING
<br />9500
<br />._ -¢j_
<br />ELEV
<br />i �
<br />- .m
<br />XIMATE
<br />5)
<br />9501
<br />_LOCATIO
<br />ER
<br />� T
<br />I
<br />�(IPSTROING LINT
<br />G WG
<br />OCATION
<br />. BOTT
<br />OF, FOOT(
<br />G
<br />:.
<br />(SEE NOT" 3, 4,' & 5)
<br />B.O.F.
<br />m 948
<br />0'
<br />(SEE, NOTE
<br />3, 4, & 5
<br />0 20 40 60 80 100
<br />w DISTANCE, (ft)
<br />z
<br />7
<br />A SECTION A
<br />100
<br />0
<br />954(
<br />952(
<br />i
<br />0-
<br />3 QQy
<br />GT 950(
<br />°I4
<br />U
<br />21
<br />94800
<br />GRADING PLAN
<br />20 0 20 40 FT
<br />9520 9520
<br />9500 F 9500
<br />9480 W 9480
<br />Od7/1 Od7l1
<br />_ ANCHOR
<br />TRENCH.....
<br />ANCHOR TRENCH
<br />P
<br />P
<br />I
<br />ZOPOSED GE
<br />)COMPOSME
<br />LINER -
<br />CHOIR TRENCH
<br />.-
<br />--
<br />POSED GEOCI M
<br />MPOSTIE LI E
<br />PROPOSED
<br />GEOCOMPOSI
<br />rE LINER
<br />M�7
<br />B.O.F
<br />9508.
<br />9520
<br />TE LOCAT10
<br />OF
<br />I -- —j--- -
<br />SURFACE..
<br />ING
<br />EXISTING `LINER TERMI
<br />(SEE NOfE 1).
<br />TION
<br />(S
<br />NOTES 3.
<br />, & 5)
<br />I
<br />GRADING PLAN
<br />20 0 20 40 FT
<br />9520 9520
<br />9500 F 9500
<br />9480 W 9480
<br />Od7/1 Od7l1
<br />120 135" - -- -0 20 40
<br />3540
<br />3520
<br />z
<br />F
<br />)500
<br />94M
<br />w Ou 1uu
<br />��DISTANCE, (ft)
<br />/ B 1 SECTION B
<br />1�
<br />9540 954(
<br />a�w
<br />ANCHO
<br />ANCHOR TRENCH
<br />P
<br />PROPOSED
<br />:
<br />LINER
<br />CHOIR TRENCH
<br />.-
<br />--
<br />POSED GEOCI M
<br />MPOSTIE LI E
<br />PROPOSED
<br />GEOCOMPOSI
<br />rE LINER
<br />9520
<br />I -- —j--- -
<br />I
<br />9521
<br />-.. 9
<br />9521
<br />SURFACE GRkDING
<br />I
<br />�.......
<br />-4(SEE
<br />NOTES -3r
<br />-4:
<br />E G ING
<br />9500
<br />._ -¢j_
<br />ELEV
<br />-B O.
<br />9508,..9'
<br />- .m
<br />XIMATE
<br />5)
<br />9501
<br />_LOCATIO
<br />ER
<br />� T
<br />I
<br />�(IPSTROING LINT
<br />TERMINATION
<br />OCATION
<br />(SEE
<br />3.0.F.
<br />SURF
<br />ELEV = 992.4'
<br />!
<br />NER.
<br />) L
<br />(SEE, NOTE
<br />3, 4, & 5
<br />! T
<br />TERMINATION
<br />(SEE NOTE 1
<br />TERMINA N
<br />N
<br />120 135" - -- -0 20 40
<br />3540
<br />3520
<br />z
<br />F
<br />)500
<br />94M
<br />w Ou 1uu
<br />��DISTANCE, (ft)
<br />/ B 1 SECTION B
<br />1�
<br />9540 954(
<br />a�w
<br />ANCHO
<br />TRENCH
<br />P
<br />PROPOSED
<br />:
<br />LINER
<br />CHOIR TRENCH
<br />.-
<br />--
<br />POSED GEOCI M
<br />MPOSTIE LI E
<br />PRO
<br />OSED GE OC
<br />POS LIN
<br />9520
<br />I -- —j--- -
<br />I
<br />9521
<br />-.. 9
<br />9521
<br />I
<br />-- B
<br />SURF
<br />E G ING
<br />9500
<br />._ -¢j_
<br />ELEV
<br />-B O.
<br />9508,..9'
<br />- .m
<br />XIMATE
<br />5)
<br />9501
<br />_LOCATIO
<br />ER
<br />fIf
<br />TE
<br />OCATION
<br />(SEE
<br />SURF
<br />E GRADIN
<br />F EXISTING
<br />NER.
<br />) L
<br />(SEE, NOTE
<br />3, 4, & 5
<br />! T
<br />TERMINATION
<br />TERMINA N
<br />N
<br />SEE NOTE 1
<br />oaan
<br />oanl
<br />� 952
<br />z
<br />0
<br />950
<br />9520 9520
<br />F
<br />i
<br />9500 F 9500
<br />w
<br />9480 W 9480
<br />0470 9470
<br />LEGEND:
<br />�- - -' EXISTING GROUND SURFACE CONTOUR EL, FEET
<br />i PROPOSED GROUND SURFACE CONTOUR EL, FEET
<br />(PROVIDED BY WOODWARD & CURRAN 07/31/13)
<br />- - - - - - PROPOSED DAYLIGHT LINE
<br />APPROXIMATE LOCATION OF EXISTING LINER TERMINATION
<br />PROPOSED GROUND
<br />- -- - -- EXISTING GROUND
<br />i - - -� EXISTING PVC PIPE
<br />PVC PIPE EXTENSION (BY OTHERS)
<br />DLIMITS OF LINER EXTENSION TO REMAIN EXPOSED (APPROXIMATELY
<br />5,500 sq. ft.)
<br />NOTES:
<br />1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY THE LOCATION OF THE
<br />EXISTING LINER TERMINATION.
<br />2. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UTILITIES PRIOR TO
<br />CONSTRUCTION.
<br />3. CONTRACTOR SHALL CLEAR ALL VEGETATION FROM WITHIN THE LINER EXTENSION
<br />LIMITS PRIOR TO INSTALLING THE GEOCOMPOSITE LINER.
<br />4. CONTRACTOR SHALL GRADE THE AREA WITHIN THE LINER EXTENSION LIMITS SUCH
<br />THAT THE DISTANCE FROM THE BOTTOM OF THE PROPOSED FOOTING(S) IS /ARE
<br />NO LESS THAN 12 INCHES FROM THE TOP OF THE GEOMEMBRANE LINER.
<br />5. SURFACE UPON WHICH THE GEOCOMPOSTTE LINER WILL BE INSTALLED, SHALL BE
<br />RELATIVELY SMOOTH AND COMPACTED AND FREE OF OBJECTS THAT MAY DAMAGE
<br />THE LINER, AS APPROVED BY THE CQA ENGINEER.
<br />6. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY LOCATION OF EXISTING PVC
<br />PIPE AND SUMP.
<br />120 140 " "° '"' " °0 20
<br />9544
<br />)520
<br />9524
<br />0
<br />3500
<br />dW 950
<br />TERMIW�TION --- -- -- --- 9480
<br />NO 1) - B.O.F. �9493.'
<br />40 60 80 100 9470
<br />DISTANCE, (ft)
<br />C SECTION C
<br />100
<br />9540 %-/*%.i*%/% %,% -�% � *--
<br />ANCHO
<br />TRENCH
<br />P
<br />PROPOSED
<br />OCOMPOS
<br />LINER
<br />PRO P
<br />POSED GEOCI M
<br />MPOSTIE LI E
<br />ER
<br />I -- —j--- -
<br />-.. 9
<br />9521
<br />i
<br />-- B
<br />SURF
<br />E G ING
<br />APPROXIMATE
<br />95t ., 4
<br />/j
<br />OF f
<br />(SEE NOTES
<br />3, 4,
<br />5)
<br />_
<br />EXISTING-
<br />_LOCATIO
<br />ER
<br />fIf
<br />TE
<br />(SEE
<br />ELEV
<br />120 140 " "° '"' " °0 20
<br />9544
<br />)520
<br />9524
<br />0
<br />3500
<br />dW 950
<br />TERMIW�TION --- -- -- --- 9480
<br />NO 1) - B.O.F. �9493.'
<br />40 60 80 100 9470
<br />DISTANCE, (ft)
<br />C SECTION C
<br />100
<br />9540 %-/*%.i*%/% %,% -�% � *--
<br />(TRENCH
<br />P
<br />ANCHOR (
<br />PRO P
<br />J (SEE NO 1) odnl
<br />20 40 60 80 100 �' -" "' - "0 20 40 60 80 100'�� 0 20 40 60
<br />DISTANCE, (ft) DISTANCE. (ft) DISTANCE, (ft)
<br />E SECTION E F SECTION F G SECTIO,
<br />100 100 100
<br />20 0 20 40 FT 20 0 20 40 FT
<br />HORIZONTAL VERTICAL
<br />I aaw
<br />ANCHOR TR
<br />9521
<br />PROPOSED EOCOMPO LIN f \
<br />f
<br />O.F.. ELEV - 9501.6'
<br />— 9501
<br />APPRO [MATE LOCATION F I-.R
<br />EXISTING LINER TERM NATION SURFA E GRADING
<br />(SEE NOTE 1) (SEE OTES 3, 4, 5)
<br />oda
<br />9 0 20 40
<br />D SECTION D
<br />100
<br />60 90 100
<br />�S�DIVAt •�O
<br />OU VU
<br />��
<br />CRIPPLE CREEK &VICTOR GOLD MINING COMPANY
<br />PROJECr
<br />PROCESS SOLUTION ENHANCEMENT SYSTEM
<br />2 OR/24/13 CHANGES PER DRMS MEN TITLE
<br />RE- ISSUED FOR CONSTRUCIION CAS
<br />1 09/0e /13 RE -ISSU CONSiRUCTON MEN PSES LINER EXTENSION SECTIONS
<br />0 08/28/13 ISSUED FOR CONSTRUCTION MEN
<br />CAS
<br />DISCLAIMER DESIGNED BY CAS CHECKED BY MEN
<br />AMEC PRODUCED THE INFORMATION PRESENTED ON THIS DRAWING THROUGH THE
<br />USE OF TECHNICAL INFORMATION AND PRACTICAL EXPERIENCE SPECIFIC TO ITS DRAWN BY CAS APPROVED BY MEN
<br />EFFORTS. RECEIVING THIS DRAWING DOES NOT GUARANTEE ANY RIGHTS TO SUCH
<br />TECHNICAL INFORMATION AND PRACTICAL WERIENCE. ANY ALTERATION OR FILENAME RAWINO No REV
<br />SLE ADAPTATION c AND THE ANY UANU�TY OR LEGAL RRESPPONSI UTYTY TAG AME USER'S 1550 —A1 10 Al 10 2
<br />(TRENCH
<br />P
<br />ANCHOR (
<br />PRO P
<br />POSED GEOCI M
<br />MPOSTIE LI E
<br />ER
<br />I -- —j--- -
<br />-.. 9
<br />9521
<br />f.
<br />-- B
<br />B.O.
<br />- 9515.0'
<br />95t ., 4
<br />4 9
<br />950
<br />SU A
<br />ACE GRADIN A
<br />APPROXI T
<br />TE
<br />3.. 4
<br />LOCATION L
<br />(SEE NO 3
<br />4, & )
<br />) L
<br />LIOF
<br />NER
<br />ER --
<br />! T
<br />TERMINA N
<br />N
<br />20 40 60 80 100 �' -" "' - "0 20 40 60 80 100'�� 0 20 40 60
<br />DISTANCE, (ft) DISTANCE. (ft) DISTANCE, (ft)
<br />E SECTION E F SECTION F G SECTIO,
<br />100 100 100
<br />20 0 20 40 FT 20 0 20 40 FT
<br />HORIZONTAL VERTICAL
<br />I aaw
<br />ANCHOR TR
<br />9521
<br />PROPOSED EOCOMPO LIN f \
<br />f
<br />O.F.. ELEV - 9501.6'
<br />— 9501
<br />APPRO [MATE LOCATION F I-.R
<br />EXISTING LINER TERM NATION SURFA E GRADING
<br />(SEE NOTE 1) (SEE OTES 3, 4, 5)
<br />oda
<br />9 0 20 40
<br />D SECTION D
<br />100
<br />60 90 100
<br />�S�DIVAt •�O
<br />OU VU
<br />��
<br />CRIPPLE CREEK &VICTOR GOLD MINING COMPANY
<br />PROJECr
<br />PROCESS SOLUTION ENHANCEMENT SYSTEM
<br />2 OR/24/13 CHANGES PER DRMS MEN TITLE
<br />RE- ISSUED FOR CONSTRUCIION CAS
<br />1 09/0e /13 RE -ISSU CONSiRUCTON MEN PSES LINER EXTENSION SECTIONS
<br />0 08/28/13 ISSUED FOR CONSTRUCTION MEN
<br />CAS
<br />DISCLAIMER DESIGNED BY CAS CHECKED BY MEN
<br />AMEC PRODUCED THE INFORMATION PRESENTED ON THIS DRAWING THROUGH THE
<br />USE OF TECHNICAL INFORMATION AND PRACTICAL EXPERIENCE SPECIFIC TO ITS DRAWN BY CAS APPROVED BY MEN
<br />EFFORTS. RECEIVING THIS DRAWING DOES NOT GUARANTEE ANY RIGHTS TO SUCH
<br />TECHNICAL INFORMATION AND PRACTICAL WERIENCE. ANY ALTERATION OR FILENAME RAWINO No REV
<br />SLE ADAPTATION c AND THE ANY UANU�TY OR LEGAL RRESPPONSI UTYTY TAG AME USER'S 1550 —A1 10 Al 10 2
<br />9 0 20 40
<br />D SECTION D
<br />100
<br />60 90 100
<br />�S�DIVAt •�O
<br />OU VU
<br />��
<br />CRIPPLE CREEK &VICTOR GOLD MINING COMPANY
<br />PROJECr
<br />PROCESS SOLUTION ENHANCEMENT SYSTEM
<br />2 OR/24/13 CHANGES PER DRMS MEN TITLE
<br />RE- ISSUED FOR CONSTRUCIION CAS
<br />1 09/0e /13 RE -ISSU CONSiRUCTON MEN PSES LINER EXTENSION SECTIONS
<br />0 08/28/13 ISSUED FOR CONSTRUCTION MEN
<br />CAS
<br />DISCLAIMER DESIGNED BY CAS CHECKED BY MEN
<br />AMEC PRODUCED THE INFORMATION PRESENTED ON THIS DRAWING THROUGH THE
<br />USE OF TECHNICAL INFORMATION AND PRACTICAL EXPERIENCE SPECIFIC TO ITS DRAWN BY CAS APPROVED BY MEN
<br />EFFORTS. RECEIVING THIS DRAWING DOES NOT GUARANTEE ANY RIGHTS TO SUCH
<br />TECHNICAL INFORMATION AND PRACTICAL WERIENCE. ANY ALTERATION OR FILENAME RAWINO No REV
<br />SLE ADAPTATION c AND THE ANY UANU�TY OR LEGAL RRESPPONSI UTYTY TAG AME USER'S 1550 —A1 10 Al 10 2
<br />
|