Laserfiche WebLink
0 <br />0 <br />n <br />yl <br />i <br />3 <br />a <br />n <br />0 <br />u <br />_l <br />I <br />n <br />n <br />NEW <br />f <br />i <br />h <br />0 <br />:v <br />a <br />a a •a <br />IMF <br />EXISTING CONDITIONS <br />20 0 20 40 FT <br />1 <br />GEOMEMBRANE LAYOUT <br />20 0 20 40 FT <br />TO CONCRETE WING — <br />SEE DETAIL e <br />— 12 <br />`C <br />ANCHOR TRENCH <br />t,tt DETAIL�� <br />PVC <br />N <br />LEGEND: <br />`- EXISTING GROUND SURFACE CONTOUR EL, FEET <br />i -- — APPROXIMATE LOCATION OF EXISTING LINER TERMINATION <br />�... —� EXISTING PVC PIPE <br />PVC PIPE EXTENSION (BY OTHERS) <br />LIMITS OF LINER EXTENSION (APPROXIMATELY 8.000 sq. ft.) <br />NOTES: <br />1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY THE LOCATION OF THE <br />EXISTING LINER TERMINATION. <br />2. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UTILITIES PRIOR TO <br />CONSTRUCTION. <br />3. CONTRACTOR SHALL CLEAR ALL VEGETATION FROM WITHIN THE LINER EXTENSION <br />LIMITS PRIOR TO INSTALLING THE GEOCOMPOSITE LINER. <br />4. CONTRACTOR SHALL GRADE THE AREA WITHIN THE LINER EXTENSION LIMITS SUCH <br />THAT THE DISTANCE FROM THE BOTTOM OF THE PROPOSED FOOTING(S) IS /ARE <br />NO LESS THAN 12 INCHES FROM THE TOP OF THE GEOMEMBRANE LINER. <br />5. SURFACE UPON WHICH THE GEOCOMPOSITE LINER WILL BE INSTALLED, SHALL BE <br />RELATIVELY SMOOTH AND COMPACTED AND FREE OF OBJECTS THAT MAY DAMAGE <br />THE LINER, AS APPROVED BY THE COA ENGINEER. <br />8. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY LOCATION OF EXISTING PVC <br />PIPE AND SUMP. <br />'Olt' <br />wo <br />11 It <br />EXISTING CONDITIONS <br />20 0 20 40 FT <br />1 <br />GEOMEMBRANE LAYOUT <br />20 0 20 40 FT <br />TO CONCRETE WING — <br />SEE DETAIL e <br />— 12 <br />`C <br />ANCHOR TRENCH <br />t,tt DETAIL�� <br />PVC <br />N <br />LEGEND: <br />`- EXISTING GROUND SURFACE CONTOUR EL, FEET <br />i -- — APPROXIMATE LOCATION OF EXISTING LINER TERMINATION <br />�... —� EXISTING PVC PIPE <br />PVC PIPE EXTENSION (BY OTHERS) <br />LIMITS OF LINER EXTENSION (APPROXIMATELY 8.000 sq. ft.) <br />NOTES: <br />1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY THE LOCATION OF THE <br />EXISTING LINER TERMINATION. <br />2. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UTILITIES PRIOR TO <br />CONSTRUCTION. <br />3. CONTRACTOR SHALL CLEAR ALL VEGETATION FROM WITHIN THE LINER EXTENSION <br />LIMITS PRIOR TO INSTALLING THE GEOCOMPOSITE LINER. <br />4. CONTRACTOR SHALL GRADE THE AREA WITHIN THE LINER EXTENSION LIMITS SUCH <br />THAT THE DISTANCE FROM THE BOTTOM OF THE PROPOSED FOOTING(S) IS /ARE <br />NO LESS THAN 12 INCHES FROM THE TOP OF THE GEOMEMBRANE LINER. <br />5. SURFACE UPON WHICH THE GEOCOMPOSITE LINER WILL BE INSTALLED, SHALL BE <br />RELATIVELY SMOOTH AND COMPACTED AND FREE OF OBJECTS THAT MAY DAMAGE <br />THE LINER, AS APPROVED BY THE COA ENGINEER. <br />8. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY LOCATION OF EXISTING PVC <br />PIPE AND SUMP. <br />