My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-01_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2013-10-01_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:31:58 PM
Creation date
10/2/2013 8:25:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/1/2013
Doc Name
Response to Adequacy
From
CC&V
To
DRMS
Type & Sequence
TR68
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECHNICAL SPECIFICATIONS <br />b. Product identification <br />C. Thickness <br />d. Roll number <br />e. Batch or lot number <br />f. Panel number (when applicable) <br />g. Roll dimensions <br />2. CONTRACTOR shall ensure that geomembrane rolls are properly loaded and secured to prevent <br />damage during transit. <br />3. CONTRACTOR shall protect geomembrane from excessive heat, cold, puncture, cutting, or <br />other damaging or deleterious conditions. <br />4. CONTRACTOR shall ensure personnel responsible for loading, transport and unloading of <br />geomembrane are fully aware of the consequences of damage to geomembrane, and are familiar <br />with handling and transport constraints imposed by MANUFACTURER. <br />B. Acceptance at Site <br />1. CQA MONITOR shall perform inventory and surface inspection for defects and damage of all <br />geomembrane rolls upon delivery. <br />2. CONTRACTOR shall unroll and inspect any geomembrane roll that may be damaged below <br />surface. <br />3. CONTRACTOR shall repair damage resulting from handling and transport of geomembranes at <br />no additional cost to CC &V. If irreparable, in the opinion of CERTIFYING ENGINEER, <br />damaged materials shall be replaced at no additional cost to CC &V. <br />C. Storage and Protection <br />1. MANAGER will provide area for on -site storage of the geomembrane rolls from time of delivery <br />until installation. <br />2. The storage and handling of the materials is the responsibility of CONTRACTOR from the time <br />the materials are manufactured until the time the completed installation is accepted. <br />CONTRACTOR is responsible for preparing the storage location and for the protection of the <br />materials from the elements (e.g. ultraviolet light, moisture, temperature, etc.). <br />3. After CONTRACTOR has removed material from storage, CONTRACTOR shall protect <br />geomembrane from puncture, dirt, grease, water, moisture, mud, mechanical abrasion, excessive <br />heat, and other sources of damage. <br />4. CONTRACTOR shall preserve integrity and readability of the geomembrane roll labels, and <br />store the rolls such that MANAGER and CERTIFYING ENGINEER have access to the <br />package slips or roll labels for each roll to verify roll acceptance. <br />5. The rolls shall be stored on a prepared surface (not wooden pallets) and should not be stacked <br />more than two rolls high. <br />1.5 SITE CONDITIONS <br />A. Geomembrane Deployment <br />1. Do not proceed with deployment at an ambient temperature below 14° F or above 100° F unless <br />otherwise authorized, in writing, by MANAGER, DESIGN ENGINEER, and CERTIFYING <br />ENGINEER. Temperature monitoring shall be performed by the CQA MONITOR. <br />Geomembrane August 28, 2013 <br />02776.1 -5 Revision 0 <br />S \Projects \1550 - CC &V Field Spt CQA PSES Bldg \8 0 Project Engineering and Design \8 2 Specificanons\PSES Pipe Rack Liner Extension Specifications \02776 1 Geomembrane docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.