My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-01_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2013-10-01_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:31:58 PM
Creation date
10/2/2013 8:25:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/1/2013
Doc Name
Response to Adequacy
From
CC&V
To
DRMS
Type & Sequence
TR68
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECHNICAL SPECIFICATIONS <br />1. The geomembrane supplied is suitable for the environmental conditions at the site and the service <br />conditions as described in this SPECIFICATION. <br />2. The geomembrane supplied meets or exceeds all published SPECIFICATIONS as referenced by <br />the SPECIFICATION. <br />3. The geomembrane are free of defects in materials and workmanship. <br />4. The CONTRACTOR shall repair or replace all defects in the material detected on -site, including <br />uncovering and recovering the work, in compliance with the SPECIFICATIONS at no additional <br />cost to CC &V. <br />5. The CONTRACTOR shall repair any detected leaks in any seams (manufactured or field joined), <br />including uncovering and recovering the work, in compliance with the SPECIFICATIONS at no <br />additional cost to CC &V. <br />1.3 QUALITY ASSURANCE <br />A. Manufacturing Qualifications <br />1. The MANUFACTURER(s) shall have experience in the manufacture of the type of <br />geomembrane that is being installed at the PSES Pipe Rack Liner Extension Project totaling at <br />least five completed facilities totaling a minimum of 5,000,000 square feet between all five <br />facilities. <br />2. The MANUFACTURER shall provide sufficient production and qualified personnel to meet the <br />demands of the work and shall have an internal quality control program for its product. <br />3. The MANUFACTURER shall permit MANAGER, DESIGN ENGINEER, and /or <br />CERTIFYING ENGINEER or their authorized representative to visit the manufacturing plant. <br />B. Geomembrane Installation Qualifications (INSTALLER) <br />1. INSTALLER shall be the MANUFACTURER or an approved CONTRACTOR trained and <br />licensed to install the MANUFACTURER'S geomembrane. <br />2. Installation shall be performed under the constant direction of single installation superintendent <br />who shall remain on -site and be responsible, throughout the geomembrane installation, for <br />geomembrane layout, seaming, patching, testing, repairs, and all other activities by INSTALLER. <br />3. The installation superintendent shall have installed or supervised, at a minimum three installation <br />projects that entailed the installation of at least a total of 1,000,000 square feet of the type of <br />geomembrane that is being installed at the PSES Pipe Rack Liner Extension. <br />4. Actual seaming shall be performed under the direction of a master aeamer (who may also be the <br />installation superintendent) who has seamed a minimum of 1,000,000 square feet of the type of <br />geomembrane that is being installed at the PSES Pipe Rack Liner Extension Project, using the <br />same type of seaming apparatus specified for the Work. <br />5. The installation superintendent and /or master seamer shall be present whenever seaming is <br />performed. <br />C. Quality Assurance Program <br />1. All work shall be constructed, monitored, and tested in compliance with the requirements of the <br />Geosynthetic Construction Quality Assurance Plan (Section 01400.2). CONTRACTOR and <br />MANUFACTURER shall participate in and comply with all items in these SPECIFICATIONS <br />and requirements of the CQA plan. <br />Geomembrane August 28, 2013 <br />02776.1 -3 Revision 0 <br />S \Projects \1550 - CUV Field Spt CQA PSES Bldg \8 0 Project Engineering and Design \8 2 Spectficanons\PSES Pipe Rack Liner Extension Specifications \02776 I Geomembrane docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.