My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-01_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2013-10-01_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:31:58 PM
Creation date
10/2/2013 8:25:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/1/2013
Doc Name
Response to Adequacy
From
CC&V
To
DRMS
Type & Sequence
TR68
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECHNICAL SPECIFICATIONS <br />C. Coordination of all construction activities associated with the various CONTRACTOR(S). <br />d. Scheduling and coordinating construction activities with required CQA testing and activities. <br />C. Overseeing the construction quality control operations performed by the <br />CONTRACTOR(S). <br />f. Approve specific corrective measures to be implemented during construction when <br />deviations from the SPECIFICATIONS occur. <br />g. Ensure that required quality control testing has been performed in accordance with the CQA <br />Plan and to the satisfaction of the CQA MONITOR. <br />IL Ensure that the CQA personnel are provided with all documentation required in the CQA <br />Plan and project SPECIFICATIONS. <br />C. DESIGN ENGINEER <br />1. In this CQA Plan the DESIGN ENGINEER refers specifically to AMEC. The DESIGN <br />ENGINEER is the individual or firm responsible for the design and preparation of the project <br />construction DRAWINGS and project SPECIFICATIONS. The DESIGN ENGINEER is <br />responsible for approving all design and project SPECIFICATION changes, modifications, or <br />clarifications encountered during construction. <br />D. CERTIFYING ENGINEER <br />1. In this plan, CERTIFYING ENGINEER refers specifically to AMEC. CERTIFYING <br />ENGINEER is the individual or firm responsible for certifying the construction was performed in <br />compliance with the DRAWINGS and SPECIFICATIONS. MANAGER and CERTIFYING <br />ENGINEER will be responsible for the resolution of all quality assurance issues. <br />E. CONSTRUCTION QUALITY ASSURANCE MONITOR <br />The Construction Quality Assurance Monitor, also referred to as the "CQA MONITOR ", is the <br />firm or individual responsible for performing the CQA tasks outlined in this plan. The CQA <br />MONITOR is the official CQA representative of CC &V and has the responsibility of overseeing <br />the CQA aspects of the project. In this CQA Plan the CQA MONITOR is associated with the <br />CERTIFYING ENGINEER and refers specifically to AMEC. The CQA MONITOR has the <br />authority to stop any aspect of the work that is not in compliance with the CQA Plan. Work <br />would then be resumed once corrective action has been approved by the MANAGER and <br />CERTIFYING ENGINEER. The specific responsibilities of the CQA MONITOR include: <br />a. Review the design DRAWINGS, project SPECIFICATIONS, and related guidance <br />documents. <br />b. Review all CONTRACTOR QC submittals and make appropriate recommendations. <br />C. Observe geosynthetic material delivery, unloading, and storage. <br />d. Obtain and test geosynthetic conformance samples during geosynthetics manufacture. <br />e. Observe prepared subgrade prior to geosynthetic deployment. <br />f. Monitor and document geosynthetic material placement, trial seam testing, non - destructive <br />testing, seaming and repair operations, and destructive testing. <br />g. Identify seam samples for CQA destructive testing. <br />h. Assure that testing equipment used, and tests performed are conducted according to project <br />SPECIFICATIONS and industry standards. <br />i. Perform or observe, document, and report test results to MANAGER as required. <br />Geosynthetics Construction Quality Assurance (CQA) Plan August 28, 2013 <br />01400.2 -2 Revision 0 <br />S \Projects \1550 - CC &V Field Spt CQA PSES Bldg \8 0 Project Engineering and Design \8 2 Specificanons\PSES Pipe Rack Liner Extension Specifications \01400 2 Geosynthe"cs CQA docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.