TECHNICAL SPECIFICATIONS <br />B. PROGRESS MEETINGS <br />MANAGER will hold a daily progress meeting, either before the start of work or at the <br />completion of work. At a minimum, this meeting will be attended by the CQA MONITOR and <br />CONTRACTOR. The purpose of this meeting will be to: <br />a. Review all the previous day's accomplishments and activities <br />b. Review scheduled work location and activities for the day <br />C. Discuss any problems or potential construction problems <br />d. Review test data <br />C. DEFICIENCY MEETINGS <br />Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a <br />minimum, these meetings will be attended by the CQA MONITOR and CONTRACTOR. If the <br />problem relates to a design issue, MANAGER, DESIGN ENGINEER and CERTIFYING <br />ENGINEER should also be present. The meeting will be documented by the CQA MONITOR. <br />2.5 EARTHWORKS CONSTRUCTION QUALITY ASSURANCE <br />A. For the construction of the Pipe Rack Liner Extension; all earthworks shall be in accordance with the <br />DRAWINGS and SPECIFICATIONS. A CQA monitoring and testing program shall be implemented <br />by CC &V to ensure construction compliance by the CONTRACTOR. The CQA testing program shall <br />consist of construction testing of materials used for the construction of the Pipe Rack Liner Extension. <br />The types of materials are defined in the SPECIFICATIONS. During construction, the CQA <br />MONITOR shall sample and test these soil types to determine if they meet SPECIFICATIONS. The <br />CQA MONITOR shall obtain and test soil samples in accordance with American Society for Testing <br />and Material standards ASTM D75 and ASTM D420. All tests shall be performed by the CQA <br />MONITOR on -site or in a geotechnical laboratory approved by the CERTIFYING ENGINEER. <br />B. CONSTRUCTION TESTING <br />During construction; the CQA MONITOR shall test all earthwork components to verify that the <br />construction is in accordance with the SPECIFICATIONS. Testing shall be performed on all soil <br />used in the construction to confirm the materials meet SPECIFICATIONS. The CQA <br />MONITOR shall conduct testing after final placement of the materials. The tests to be <br />performed, and the testing frequency, for each material type are listed in Table 01400.1 -1. The <br />testing frequencies specified in Table 01400.1 -1 shall be increased when the CQA MONITOR <br />determines that construction conditions (such as adverse weather, equipment breakdown, <br />improperly ballasted compactor, excessive lift thickness, improper soil type, improper moisture <br />conditioning and compaction) warrant additional tests. Additional tests will be approved by <br />MANAGER and directed by the CQA MONITOR. <br />C. CONSTRUCTION MONITORING <br />The CQA MONITOR will monitor and test all earthwork quality assurance components of the <br />construction to verify that the construction is in accordance with the SPECIFICATIONS. The <br />CQA MONITOR shall identify inadequate construction methodologies or materials that may <br />adversely impact the performance of the facility being constructed and existing structures. The <br />CQA MONITOR will record visual observations throughout the construction process to ensure <br />that the materials are placed to the minimum dimensions as shown on the DRAWINGS. Quality <br />control testing will be performed by the CONTRACTOR. <br />Earthworks Construction Quality Assurance (CQA) Plan September 24, 2013 <br />01400.1 -4 Revision 1 <br />S \Projects \1550 - CC &V Field Slit CQA PSES Bldg \8 0 Project Engineering and Dcsign \8 2 Specifications\PSES Pipe Rack Liner Extension Specifications\Ind —dual Specification <br />Secnons \01400 1 Rl Earthworks CQA docx <br />