Laserfiche WebLink
Susan Burgmaier -2- September 26, 2013 <br />Reclamation Estimate <br />During reclamation 6,000 cubic yards of material will not be hauled to B -Seam portal <br />bench backfill. An additional 20 feet of 36" culvert will need to be removed. Based on <br />theses numbers a credit of $6,167.33 is proposed for the reclamation estimate. <br />The following revised permit pages and maps are enclosed. <br />Volume I Page 2.05 -64 <br />Volume II Maps 15 -2, 20, and 21 -2 <br />Reclamation Estimate <br />Sincerely, <br />J. E. Stover, P.E. <br />Consulting Engineer <br />Cc: Bureau of Land Management - Electronic <br />USDA -FS - Electronic <br />Paonia Library <br />Bill Bear <br />