My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-01_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-10-01_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:31:57 PM
Creation date
10/1/2013 1:01:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
10/1/2013
Doc Name
Letter Application and Public Notice
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR83
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7TH STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />September 26, 2013 <br />Susan Burgmaier <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, <br />Technical Revision #83, <br />Permit C- 1996 -083 <br />Dear Ms. Burgmaier: <br />Bowie No. 2 Mine <br />Expand Material Storage Area <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />tv 5D <br />R� �3 <br />o� R�G�110N <br />OMs�ph G PNp �E('t <br />M�N1N <br />On behalf of Bowie Resources, LLC, (BRL), enclosed is an application for a technical <br />revision to further increase the size of the material storage area located east of the B- <br />Seam portals. <br />Technical revision no. 79 initially approved the material storage area expansion and the <br />excavation of 8,000 cubic yards from the excess material stockpile. An additional <br />6,000 cubic yards will need to be excavated from the excess material stockpile in order <br />to further expand the material storage area. Bowie proposes to utilize all of the material <br />excavated from the excess material stockpile to supplement the volume of cover <br />material available for gob pile numbers 2 and 4. <br />The 14,000 cubic yard deficit of fill material for the B -Seam portals at final reclamation <br />would mean the reclaimed ground surface would be about 1.9 feet lower than the <br />original ground surface over the 4.5 acre disturbed area. <br />Thirty -six inch diameter culvert C -7 was lengthened 270 feet with the approval of TR- <br />79. The culvert will need to be extended an additional 20 feet with the approval of this <br />technical revision. <br />Right of Entry <br />The work will be performed on land owned by Bowie. <br />Affected and Disturbed Area <br />There will not be any increase in the affected or disturbed area. <br />Cultural Resources <br />Not required, no new disturbance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.