Laserfiche WebLink
cc <br />dr <br />11) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture- Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period. <br />LVSCF: Sample No's 76 thru 80 were obtained during this reporting period <br />SLF: Sample No. 47 and No. 48 were obtained during this reporting period <br />General Project Items <br />Meetings and Discussions: Weekly Project Status meeting was held at 10:00am on August 28th between CC &V, Ames, <br />CDOT and Amec. Topics discussed were Safety, Schedule, Project Issues, concerns and planning. <br />Summary of Concerns: None <br />CC& V: Daily updates, reporting and scheduling are some of the tasks occurring between CC&V Projects, Amec and Ames. <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: <br />Thorne M Clark / <br />Project Resident Manager ` <br />Ph: 970.846.9337 <br />Approved By: Date: q - ate( 3 <br />Page 4 of 7 MLE2 WE 08.31.13.doc <br />