cc <br />nil M' <br />embankment as fill lifts were brought up. Progress is expected to continue. A Cat D6N was utilized to slope <br />contour as the fill was brought up. <br />See Hwy 67 embankment fill below for additional detail on materials placed. <br />Note: An Amec field representative monitored structural fill material temperatures placed within the areas of fill <br />during all shifts. Average structural fill temperatures were above 32 °F. <br />Clay (SLF) Processing: <br />Cameron Site: Clay processing continued during this reporting period. <br />Squaw Gulch Clay Borrow Site: Clay stripping and stockpiling occurred during this reporting period. A temporary <br />access road was constructed though the clay borrow site using cut material imported from near stations 64 +00 to <br />70 +00 on the ADR haul road. <br />Underdrain System: <br />Secondary Underdrain: No work was performed on the Secondary underdrain during this reporting period. <br />A total of 1380 feet of Secondary underdrain has been completed. <br />Primary Underdrain: No work was performed on the Primary underdrain during this reporting period. <br />A total of 1280 feet of Primary underdrain has been completed. <br />Temporary Underdrain: No work was performed on the temporary underdrain during this reporting period. <br />Tree /Slash Clearing, Chipping: <br />Seed Masters paused operations until further notice. <br />B) Underground Workings <br />Exploratory excavation was performed on underground working No.U6273 and No.U6274. These sites require <br />further excavation and exploratory efforts. <br />Confirmatory drilling was performed on underground working No. 6167 and 06273. All drill hole locations were <br />established on a 4 -foot center isolating any voids found. Further remediation efforts will be ongoing until remediated. <br />Summary of the remediation efforts will follow 100% remediation. <br />Underground Working No. 6147: The first layer of Geogrid was placed. Additional Geogrid layers are expected to be <br />placed until 100% remediated. <br />Underground Working No. 6187: Three layers of Geogrid were placed, completing the remediation of this working. <br />No other sites were remediated during this reporting period. <br />Q Highway 67 <br />A proof roll was performed on Wednesday 9.05.13 with an Ames' tandem water truck. The proof roll was observed <br />by CC &V, Yeh and Associates, Amec, Ames and CDOT. Sub -base was approved for placement of Base materials, <br />(Class 6, ABC) <br />Schmidt Construction began hauling Aggregate Base Course (ABC) material at approximately 07:00 from the <br />Schmidt Pit located near Fountain, Colorado on September &12013. The round trip took approximately 3 hours and <br />Page 2 of 7 MLE2 WE 09.07.13.doe <br />