My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C2010089
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C2010089
>
_INSPECTION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 8:37:04 AM
Creation date
9/30/2013 8:00:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DRMS
To
David Anderson
Inspection Date
9/25/2013
Email Name
MLT
SB1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 25,2013 C-2010-089/New Horizon North Mine MLT <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution <br /> 4.06.4: <br /> • Two topsoil stockpiles have been constructed: one for Progresso (81 PRO) soil, and the <br /> other for all other soils (REC). <br /> • Salvage operations ahead of the pit appear to be complete, for the time being. <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were issued as a result of this inspection, and none are pending. <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 1 Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.