Laserfiche WebLink
Centennial Mine Reclamation Report 2013 <br />B- Mining Company <br />Michael Moore, President <br />• 12'x12'x8" concrete slab with 1/2" & 5/8" rebar in 16" grid pattern. <br />Concrete was prepared with 5 sack mix. <br />• The concrete slab was covered with approximately two feet (2') of <br />muck/dirt and seeded. <br />• Access road to the vent hole was ripped and water bars put in. <br />Vent Shaft appearance after reclamation. <br />Vent hole before reclamation. <br />Centennial Mine Reclamation Work & Pictures Page 6 <br />