Laserfiche WebLink
Centennial Mine Reclamation Report 2013 <br />B- Mining Company <br />Michael Moore, President <br />Catch ponds and concrete pad before reclamation. <br />K <br />Picture directly above was the old concrete pad before reclamation. <br />The reclamation of the 8 -ft diameter vent shaft and vent shaft area <br />included the following actions: <br />• 1/4" steel plate was put over the hole. <br />Centennial Mine Reclamation Work & Pictures Page 5 <br />