My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-10_REVISION - M1985112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985112
>
2013-09-10_REVISION - M1985112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:45 PM
Creation date
9/24/2013 5:20:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985112
IBM Index Class Name
REVISION
Doc Date
9/10/2013
Doc Name
TR01 Second Adequacy Review
From
DRMS
To
J&T Consulting, Inc
Type & Sequence
TR1
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loloff Mine <br />TR -0 1 Second Adequacy Letter <br />Page 3 of 4 <br />18. The response is adequate. <br />19. The response is adequate. <br />20. The response is adequate. <br />21. See question #28 below. <br />Rule 6.4.12 Exhibit L - Reclamation Costs <br />22. The Operator will provide a breakdown of the costs of dewatering into phases after the <br />surveying is complete. <br />23. No response by the Operator <br />24. The Division will expect a response under separate cover from Loloff Constructions, Inc.'s <br />legal counsel. <br />Rule 6.4.19 Exhibit S - Permanent Man -made Structures <br />25. Please revise Exhibit C to indicate and label all structures within 200 of the affected <br />boundary. <br />Rule 6.5 - Geotechnical Stability Exhibit <br />26. Division staff is reviewing the revised stability analysis and responses to the Division's <br />memo dated July 30, 2013. <br />27. The response is adequate. <br />Hydrology <br />28. Division staff is reviewing the Operator's hydrology responses to the Division's letter dated <br />August 5, 2013. <br />Please be advised the Loloff Mine technical revision may be deemed inadequate, and the <br />application may be denied on September 25, 2013 unless the above mentioned adequacy <br />review items are addressed to the satisfaction of the Division. If you feel more time is needed <br />to complete your reply, the Division can grant an extension to the decision date. This will be <br />done upon receipt of a written waiver of your right to a decision by September 25, 2013 and <br />request for additional time. This must be received no later than the deadline date. <br />
The URL can be used to link to this page
Your browser does not support the video tag.