My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-10_REVISION - M1985112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985112
>
2013-09-10_REVISION - M1985112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:45 PM
Creation date
9/24/2013 5:20:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985112
IBM Index Class Name
REVISION
Doc Date
9/10/2013
Doc Name
TR01 Second Adequacy Review
From
DRMS
To
J&T Consulting, Inc
Type & Sequence
TR1
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />September 10, 2013 <br />J.C. York <br />J &T Consulting, Inc. <br />305 Denver Avenue, Suite D <br />Fort Lupton, CO 80621 <br />Re: Loloff Construction, Inc., Loloff Mine, Permit No. M- 1985 -112 <br />Technical Revision No. 1(TR -01) Second Adequacy Review <br />Mr. York: <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta Pineda <br />Director <br />The Division of Reclamation, Mining and Safety (Division) has reviewed the content of Loloff <br />Construction, Inc. adequacy letter response dated August 27, 2013 and submits the following <br />comments. The Division is required to make an approval or denial decision no later than <br />September 25, 2013 therefore; a response to the following review concerns should be <br />submitted to the Division as soon as possible. <br />1. The response is adequate. <br />Rule 6.4.4 Exhibit D - Mining Plan <br />2. The response for future slopes to be mined at 3H:1V is adequate. The Operator must provide <br />survey data for the mined slopes in the northwest corner, west side and southwest corner <br />and explain how the existing slopes will be backfilled or otherwise established and stabilized <br />at a 3HAV slope if required. <br />3. An updated Exhibit C following the survey as required. <br />4. The response is adequate. <br />5. The response is adequate. <br />6. The response is adequate. <br />Rule 6.4.7 Exhibit G - Water Information <br />7. The response is adequate. <br />8. The response is adequate. <br />9. The response is adequate. <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive <br />Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.