My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-20_PERMIT FILE - M2012036
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012036
>
2013-09-20_PERMIT FILE - M2012036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:23 PM
Creation date
9/24/2013 5:15:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012036
IBM Index Class Name
Permit File
Doc Date
9/20/2013
Doc Name
APPROVAL:SURETY REDUCTION
From
DRMS
To
All-Rite Paving & Redi-Mix, Inc
Type & Sequence
SR1
Email Name
TOD
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Reclaim <br />Site: Sharp Gravel Pit <br />COST SUMMARY WORK <br />Gravel Pit <br />PROJECT IDENTIFICATION <br />Permit Action: Surety Reduction Permit/Job #: M2012036 <br />Task #: 100 State: Colorado <br />Date: 9/19/2013 County: Bent <br />User: TOD <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: M036 -100 <br />Task <br />Descri tion <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />101 <br />102 <br />103 <br />104 <br />105 <br />Grade slopes 314: IV <br />DOZER <br />2 <br />1 <br />1 <br />1 <br />1 <br />38.41 <br />$16,211.17 <br />$10,831.34 <br />$2,755.00 <br />$14,296.64 <br />$3,609.95 <br />Spread topsoil <br />SCRAPERI <br />16.63 <br />Finish grade topsoil <br />GRADER <br />14.68 <br />Revegetation of Sharp Pit <br />REVEGE <br />54.00 <br />Mobilization/demobilization <br />MOBILIZE <br />1.45 <br />SUBTOTALS: <br />125.17 <br />$47,704.10 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />40.00 hrs <br />Profit: <br />10.00% <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): 500.00 <br />Engineering work and/or contract/bid preparation: 0.00% <br />Reclamation management and /or administration: 5.00% $2,827.77 <br />CONTINGENCY: 0.00 Total = $0.00 <br />$963.62 <br />$500.89 <br />$2,616.40 <br />$4,770.41 <br />$8,851.32 <br />$56,555.42 <br />Total = 500.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $12,179.09 <br />TOTAL BOND AMOUNT (direct + indirect) = $59,883.19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.