Laserfiche WebLink
PEABODY SAGE CREEK MINING LLC <br />OVERLAND CONVEYOR GEOTECHNICAL INVESTIGATIONS (MR04 -11) <br />RECLAMATION COST ESTIMATE <br />2 <br />Backfill, level, replace topsoil, and reseed surface disturbance <br />Backfill and level —12 auger holes (4" dia. x 30' deep) 32 cy x $2.60 /cy $83 <br />Reseed —12 auger holes @ 0.1 acres total disturbance x $300 /acre 30 <br />Subtotal Direct Costs $113 <br />CDRMS Administrative and Overhead Costs (@ 8 %) <br />Total Estimated Reclamation Cost <br />V <br />$122 <br />Tnn^/ c1 A I)" nnWN /n1+ <br />