My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-24_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2012-07-24_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:03:58 PM
Creation date
9/23/2013 9:05:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
7/24/2012
Doc Name
Cost Summary
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: West Elk Mine <br />PROJECT IDENTIFICATION <br />DEMOLITION WORK <br />Demolish and remove oil/water separator structures (MR -377) <br />Permit Action: MR -377 Permit/Job #: C1980007 <br />Task #: 77A State: Colorado <br />Date: 7/1/2011 County: Gunnison <br />User: TAK <br />Agency or organization name: DRMS <br />ITNIT COSTS <br />Abbreviation: None <br />Filename: C007 -77a <br />Location adiustment: 91.30 % <br />Structure or Item <br />Description <br />Dimensions <br />Demolition Menu <br />Selection <br />Quantity <br />y <br />Unit <br />Unit <br />Cost <br />Total Cost <br />Fiberglass oil/water <br />22x6.25 diam <br />Comprehensive storage <br />1.00 <br />EA <br />$3,707.60 <br />$3,707.60 <br />separator, 4,000 gal. <br />tank removal, non- <br />leaking - 3,000 to 5,000 <br />gal. tank <br />Concrete vault <br />3 diam x 4 deep <br />Demo. and on -site <br />38.00 <br />SF <br />$1.73 <br />$65.74 <br />disposal in existing pit, 6 <br />in. thick - Max. 200 ft. <br />push <br />3 sections of HDPE <br />6" diam x 805 <br />Pipe, corrugated metal <br />805.00 <br />LF <br />$1.65 <br />$1,328.25 <br />pipelines, buried <br />ft 1 <br />(CMP) - 8 in. diameter <br />2 sections of HDPE <br />6" x 410 1 <br />pipe <br />Pipe, corrugated metal <br />410.00 <br />LF <br />$1.65 <br />$676.50 <br />pipelines, on surface <br />(CMP) - 8 in. diameter <br />pipe <br />Subtotal <br />Job Hours: 2.63 (unadjusted): $5,778.09 <br />Total Cost <br />(adjusted for <br />location): $5,275.40 <br />tvR'3? 7 <br />7 /f/11' <br />
The URL can be used to link to this page
Your browser does not support the video tag.