Laserfiche WebLink
Task description: <br />Site: West Elk Mine <br />COST SUMMARY WORK <br />Oil/water separator <br />Permit Action: MR -377 Permit/Job #: C1980007 <br />PROJECT IDENTIFICATION <br />Task #: 77B State: Colorado <br />Date: 7/1/2011 County: Gunnison <br />User: TAK <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task Description <br />77a Demolish and remove oil/water separator <br />structures (MR -377) <br />INDIRECT COSTS <br />0.00 <br />OVERHEAD AND PROFIT: <br />Engineering work and/or contract/bid preparation: <br />Liability insurance: <br />0.00 <br />Performance bond: <br />0.00 <br />Job superintendent: <br />1.32 <br />Profit: <br />10.00 <br />Abbreviation: None <br />Filename: C007 -77b <br />Form Fleet Task <br />Used Size Hours <br />DEMOLISH 1 2.63 <br />SUBTOTALS: <br />Cost <br />$5,275.40 <br />2.63 1 $ $5,275.40 <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />$0.00 <br />$0.00 <br />$77.01 <br />$527.54 <br />$604.55 <br />$5,879.95 <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />4.25 <br />Total = $249.90 <br />Reclamation management and/or administration: <br />3.25 <br />$191.10 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $1,045.55 <br />TOTAL BOND AMOUNT (direct + indirect) = $6,320.95 <br />MR'377 <br />'711 / ri <br />