Laserfiche WebLink
Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(GEN. ) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.225 <br />(CAT HB) <br />0.930 <br />(CAT HB) <br />0.894 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.8369 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />933.65 LCY/hr <br />3734.6 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.511/LCY <br />Total job time: <br />Total job cost: <br />34.27 Hours <br />$65,358.07 <br />Page 3 of 18 <br />CIRCES Cost Estimating Software <br />