Laserfiche WebLink
BULLDOZER WORK <br />Task description: Doze East Pit Spoil in SL -07 Areas <br />Permit Action: Partial Phase I Bond <br />Site: Colowyo Coal Mine Release SL -07 <br />PROJECT IDENTIFICATION <br />Task #: S05 State: Colorado <br />Date: 8/28/2013 County: Moffat <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EOL <br />Basic Machine: <br />Horsepower <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IIPMENT COST <br />Cat D1 1R - 11U <br />850 <br />Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />Page 2 of 18 <br />Permit /Job #: C1981019 <br />Abbreviation: None <br />Filename: C019 -S05 <br />Total unit Cost/Hour: $476.80 <br />Total Fleet Cost/Hour: $1,907.19 <br />MATERIAL OUANTITIES <br />Initial Volume: 127,982 <br />Swell factor: 1.000 <br />Loose volume: 127,982 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />285 feet <br />1.115.6 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient <br />Average site altitude: <br />-10% <br />7,600 feet <br />Material weight: 2,572 lbs/LCY <br />Weight description: User Provided <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 AB.AVG. <br />Material consistency: 1.100 (CAT HB) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$143.02 <br />NA <br />Operating Cost/Hour: <br />$280.92 <br />100 <br />Ripper op. Cost/Hour: <br />$15.45 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $476.80 <br />Total Fleet Cost/Hour: $1,907.19 <br />MATERIAL OUANTITIES <br />Initial Volume: 127,982 <br />Swell factor: 1.000 <br />Loose volume: 127,982 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />285 feet <br />1.115.6 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient <br />Average site altitude: <br />-10% <br />7,600 feet <br />Material weight: 2,572 lbs/LCY <br />Weight description: User Provided <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 AB.AVG. <br />Material consistency: 1.100 (CAT HB) <br />CIRCES Cost Estimating Software <br />