My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-18_PERMIT FILE - M2013064 (9)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013064
>
2013-09-18_PERMIT FILE - M2013064 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:25:11 PM
Creation date
9/19/2013 2:23:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013064
IBM Index Class Name
PERMIT FILE
Doc Date
9/18/2013
Doc Name
New Application
From
Varra Companies, Inc
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit I & J — Soils & Vegetation Information <br />remaining above the anticipated static water level of the completed reservoir basins. <br />Windrowed salvage soil stockpiles will be graded such that the side slopes are 3H:1V or <br />flatter. This will aid seeding and vegetation efforts while reducing the profile exposure <br />of the stockpile to wind and water erosion, keeping the material stable until used for <br />reclamation. <br />Direct precipitation from short duration, high intensity rainstorm events, and wind, are <br />the major threats to soil stability at this location. Although the location is nearly a <br />table, and although the extraction will result in basins that cause water from direct <br />precipitation to drain internally, additional measures will be taken to assure site stability <br />and protection of off -site areas. The operator's stormwater management plan provides <br />additional detailed information about maintaining on -site stability consistent with its <br />pending Colorado Department of Health stormwater permit, and is available upon <br />request by the Colorado Office of Mined Land Reclamation. <br />The measures taken to stabilize the soil stockpiles, as described above, should be <br />adequate for controlling erosion from wind and direct precipitation. Due to the flat <br />topography of the parcel, the interception of upland overland flows by local irrigation <br />ditches and surrounding roads, there is little upland watershed that would impact these <br />locations. <br />The greater threat of erosion will be to resoiled slopes pending establishment of <br />vegetation during reclamation. While some sheet and rill erosion can be anticipated on <br />unprotected areas following seed bed preparation and seeding, the conservation <br />measures provided below should help to limit erosion potential that would threaten the <br />revegetation efforts. <br />Prior to resoiling, the foundation material that will underlie the soil will be sculpted to <br />establish initial soil stabilization features, and left rough to aid in resoil adherence. Soil <br />will be placed over a 12 -18± inch minimum friable, or otherwise unconsolidated, subsoil. <br />A 12 -18± inch swale with slopes of 3H:1V or flatter will be placed above finished slopes <br />where necessary to direct any upland surface flows around the finished slopes to an <br />established stable drainage corridor. <br />Resoiled areas will be allowed a minimum of three months to settle prior to seeding. <br />Seeding will follow in the fall or spring as detailed under Exhibit E — Reclamation Plan. <br />Resoiling will occur when soil moisture is adequate to prevent blowing, yet dry enough <br />to prevent compaction. Part of the soil rebuilding process on the reconstituted soils will <br />be in establishing structure to the soils to facilitate plant -soil -water relationships. <br />Overly compacted soils will tend to limit soil structure development and create a poor <br />seedbed for later establishment. <br />Once applied to the surface, the new soils will be exposed to the raw forces of erosion <br />until adequate vegetative cover and root mass develops. Erosion requires both <br />Varra Companies, Inc. Varra- Coulson Resource Project 4 <br />OMLR 112 Permit Application 8 August 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.