Laserfiche WebLink
Estimate of Cost of RecIaznation— Howard Creek Pit #1 and #2 <br />Backfilling.................................. ............................... None Anticipated <br />Grading ...............9 acres, �?�iicozcrr«; viler, 12' swath; 1rnphr grading rate, <br />- - -- <br />12'swath equals 18 times 209 = 3762 ft times 9 acres = 33858 linear feet of grading <br />divided by 5280 feet per hour = 7 hours bulldozer time = .......................$770.00 <br />Topsoil Application .............................. None Available, None Anticipated <br />Seed Cost .......... $200 /acre tunes 9 acres, applied ............................ $1800.00 <br />Mulch Cost ........ $100 /acre times 9 acres, applied ............................. $900.00 <br />Crimping Cost, disk/ tractor cost, $60 /hr, one acre /hour rate ................. $540.00 <br />Fertilizer Cost estimate; applied, $50/ acre ....... ............................... $450.00 <br />Mobilization /Demobilization Cost ................ ............................... $1000.00 <br />Total Reclamation Cost including Labor Cost ... ............................... $5460.00 <br />Estimated cost per acre for seed, fertilizer, mulch, labor ...................... $606.00 <br />This operation will reach point of maximum disturbance near the end of mining of Pit # 1, <br />3.4 acres disturbed and app. 1.5 acres in Stockpile at Pit 42 for total of 5 acres. <br />All equipment costs include fuel, lubricants, operating labor and overhead cost estimates. <br />23.5% addition to cover indirect costs and administrative costs in the event of bond <br />forfeiture and pen-nit revocation (Rule I I7(4)(a). (4) ........................... $1284.00 <br />Total Reclamation Cost Estimate for Bonding .... ............................... $6744.00 <br />