My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981012 (10)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981012
>
_INSPECTION - C1981012 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 5:50:46 AM
Creation date
9/12/2013 7:46:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DRMS
To
Ron Thompson
Inspection Date
7/23/2013
Email Name
LDS
SB1
DIH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 23, 2013 C-1981-012/New Elk Mine LDS <br /> an SAE). Containment 1 should also be marked on the map. There was no existing diversion from the <br /> natural drainage above,past the slurry well pad, although there was an existing short spur into ditch D29. <br /> This should be rectified with a ditch design included in TR68. <br /> • No recent disturbance was observed at the core lab SAE. This area could potentially be phase 1 bond <br /> released, and the natural drainage from the south re-established. <br /> • Culvert C27 was clear <br /> • Ditch D34AA had been re-cut and was in good shape. <br /> • Culvert C2 was in good shape. The updates to map 13 should show that only one section of C2 <br /> remains. On the south side of C2, a berm should be established to prevent shop area runoff from <br /> entering the clean water system; since this was an item that was identified in the inspection report of <br /> April 29,2013, and is not the subject of a permitting action,the Division finds that this is a violation <br /> for failure to maintain disturbed area runoff control structures in accordance with the approved <br /> design. This is discussed further in the ENFORCEMENT ACTIONS section of this report. <br /> • Above C2, Ditch D34BBB was good. Below C2,the ditch runs into a wetland.At the time of the <br /> inspection water had ponded in a low section of the ditch before the willows,which acted as an <br /> impoundment. It's not clear how best to manage the flow in this location, since it would be preferable to <br /> avoid disrupting the existing wetlands by cutting a ditch to the river. <br /> • Ditch D5 had become ill-defined. D5 should be re-cut,north of the shop area. <br /> • Culvert C9A was clear. C9 was not blocked,but sediment had accumulated at the outlet. C8 was more <br /> than half full with sediment, and the inlet was damaged. Culverts C8 and C9 should be cleaned and <br /> repaired as necessary to allow maintenance. <br /> • The new armoring at the outlet of ditch D 10 had held up well to the recent heavy rain and looked very <br /> good. <br /> • The explosives area was clean and in good shape,but the ditch/berm around it needs to be re-shaped to <br /> ensure that disturbed area runoff does not flow into the clean water ditch. There was a clean water <br /> diversion ditch to the south that is not marked on map 13,which joins ditch D7. The ditch should be <br /> added to the redrawn map. Some timber should be cleared from it, and the ditch re-shaped in <br /> places. <br /> • Culvert C4 does not exist,the culvert should be removed from the redrawn map. <br /> • The cut where culvert C4 used to be should be deepened to prevent the ditch acting as an <br /> impoundment. Timber and vegetation should be cleared from ditch D7. Since these were items that <br /> were identified in the inspection report of April 29,2013, and are not the subject of a permitting <br /> action,the Division finds that this is a violation for failure to maintain ditches in accordance with <br /> the approved design. This is discussed further in the ENFORCEMENT ACTIONS section of this <br /> report. <br /> • Culvert C3 had been shortened and about 20' had been replaced with a new culvert. Some material from <br /> the work needs to be cleared up. <br /> • Some non-coal waste and vegetation should be cleared from ditch D9 and the inlet to culvert C5. <br /> Since these were items that were identified in the inspection report of April 29,2013, and are not the <br /> subject of a permitting action,the Division finds that this is a violation for failure to maintain <br /> ditches in accordance with the approved design. This is discussed further in the ENFORCEMENT <br /> Number of Partial Inspection this Fiscal Year: 0 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 5 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.