Laserfiche WebLink
Section 2.05.3(4) <br />Ponds, Impoundments, Other Treatment facilities and Diversions <br />Table of Contents <br />Introduction <br />Sediment and Water Control Facilities Plan <br />Collection Ditches, Culverts and Diversion Design Parameters <br />Designs for all Ditches in the Permit Area <br />Sedimentation Pond <br />Design Methodology <br />Special Features <br />Temporary Relocation for CC Company Second Park Lateral Ditch <br />Design Details <br />Timing <br />LIST OF MAPS <br />Map 2.05.3(4) -1 Surface Water Hydrology <br />Map 2.05.3(4) -6 Pond NHN -001 As -Built <br />Map 2.05.3(4) -7 NHN -001 Ditches As -Built (Plan) <br />Map 2.05.3(4) -8 NHN -001 Ditches As -Built (Cross Sections) <br />Appendix 2.05.3(4) -1 <br />Appendix 2.05.3(4) -2 <br />Appendix 2,05.3(4) -2A <br />Appendix 2.05.3(4) -3 <br />Appendix 2.05.3(4) -4 <br />Appendix 2.05.3(4) -5 <br />Appendix 2.05.3(4) -6 <br />Appendix 2.05.3(4) -7 <br />1 <br />2 <br />4 <br />4 <br />6 <br />6 <br />6 <br />7 <br />8 <br />LIST OF APPENDIX <br />Arcadis Report on Sediment Control <br />SECAD Design Report <br />Arcadis Pond Slope Stability Analysis <br />Water Discharge Permit <br />Del -Mont Consultants' Pipeline Design Report for CC Ditch <br />Relocation Report <br />CCC Ditch Relocation Alignment <br />>N 14w _Mr <br />Pond Qat As -Built <br />*4en 1.001 Ditches As -Built <br />y 2013 (TR 04) <br />