My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-09_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2013-09-09_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:54 PM
Creation date
9/11/2013 7:25:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
9/9/2013
Doc Name
Preliminary Adequacy Review No. 2
From
DRMS
To
Greg Lewicki and Associates, PLLC
Type & Sequence
TR4
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX. (303) 832 -8106 <br />09 September 2013 <br />Ben Langenfeld, P.E. <br />Greg Lewicki and Associates, PLLC <br />11541 Warrington Court <br />Parker, CO 80138 <br />STATE OF COLORADO <br />COLORADO <br />D I V IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive director <br />Loretta E. PMeda <br />Director <br />Re: New Horizon North Mine — Permit No. C-2010-089 <br />Technical Revision No. 4 (TR -04) As -Built Information for NHN -001. Ditches <br />Preliminary Adequacy Review No. 2 <br />Dear Mr. Langenfeld: <br />The Division issued its initial adequacy review for Technical Revision No. 4 (TR -04) on July 22, <br />2013. An adequacy response package, which included a revised Section 2.053(4) Table of <br />Contents and updates to Appendix 2.05.3(4) -7 text (pages 1, 15 and 16) and maps (2.05.3(4) -7 <br />and -8), was submitted by your office, on behalf of Western Fuels - Colorado, on August 30, <br />2013. <br />In the Division's July 22 letter, we requested that the Proof of Publication for the Public Notice <br />in the San Miguel Basin Forum be provided. Our records do not indicate that this document has <br />yet been received. Please submit Proof of Publication for the TR -04 public Notice at your <br />earliest convenience. <br />The August 30 response package has been evaluated for adequacy with respect to the regulations <br />and the approved permit. The Division's original adequacy items, updated to reflect the current <br />status of each, are repeated below. <br />DBMS 07122: The Section 2.05.3(4) Table of Contents (TOC) submitted with the <br />application is not the same version that was approved with TR -01. <br />a. Maps 2.053(4) -6, -7 and -8 are not listed, and should be added to the TOC List of <br />Maps. <br />DRMS 09/09: The maps have been added, as requested. Item is resolved <br />b. Additionally, the Division has noted a number of other updates / corrections that <br />should be made to the TOC. These are noted on the attached copy, for your <br />reference. <br />office of Office of <br />Mined Land Reclamation Denver • Grand )unction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.