Laserfiche WebLink
Task description: <br />Site: Shults Gravel Pit <br />SCRAPER TEAM WORK <br />Replace 6" Topsoil over 6 acres Disturbance <br />Permit Action: SI -01 <br />PROJECT IDENTIFICATION <br />Task #: 03A State: Colorado <br />Date: 932013 County: Rio Blanco <br />User: THM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Page 1 of 2 <br />Permit/Job #: M2000073 <br />Abbreviation: None <br />Filename: M073 -03a <br />COSTShift basis: 1 per day <br />MATERIAL OUANTITIES <br />Initial volume: 4,840 CCY Swell factor: 1.000 <br />Loose volume: 4,840 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Equipment Description <br />Material description: <br />Top Soil <br />Rated Payload: <br />81,600 pounds <br />- Scraper: Cat 637G w'push pull <br />51.00 LCY <br />LCY <br />Adjusted Capacity: <br />29.00 <br />- Dozer: Cat D7R DS Series I1 LGP <br />Support Equipment -Load Area: Cat D7R DS Series Il LGP <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Cost Breakdown: <br />Scraper Work Team Support Equipment <br />Maintenance Equipment <br />Scraper Dozer Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />0 oUtilization- machine: <br />100 95 100 <br />NA <br />NA <br />NA <br />Ownership cosVhour: <br />$100.38 $44.66 $44.66 <br />NA <br />NA <br />NA <br />Operating cost hour: <br />$235.35 $77.02 $81.07 <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA $0.00 $0.00 <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$30.02 $37.41 $37.41 <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />{ <br />$365.75 $159.09 $163.14 <br />NA <br />NA <br />NA <br />Number of Units: <br />2 1 1 <br />0 <br />0 <br />0 <br />Group Subtotals: j <br />Work: $890.59 Support: <br />$163.14 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $1,053.73 <br />MATERIAL OUANTITIES <br />Initial volume: 4,840 CCY Swell factor: 1.000 <br />Loose volume: 4,840 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />1,600 lbs /LCY <br />Material description: <br />Top Soil <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />51.00 LCY <br />Scraler Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating SoR«are <br />