My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-03_REVISION - M2000073
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000073
>
2013-09-03_REVISION - M2000073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:27 AM
Creation date
9/11/2013 7:16:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000073
IBM Index Class Name
REVISION
Doc Date
9/3/2013
Doc Name
FW Increase
From
DRMS
To
XTO Energy Inc.
Type & Sequence
SI1
Email Name
THM
GRM
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip Compacted Areas Prior to Topsoil Replacement <br />Site: Shults Gravel Pit Permit Action: SI -01 Permit/Job #: M2000073 <br />Seismic: <br />Area: <br />PROJECT IDENTIFICATION <br />Task #: 02A State: Colorado <br />Date: 932013 County: Rio Blanco <br />User: THM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D7R DS Series 11 LGP <br />Ripper Attachment: 3 -Shank Ripper <br />Cost Breakdown: <br />Ownership Cost'Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />MATERIAL OUANTITIES <br />Alternate Methods: <br />Abbreviation: None <br />Filename: M073 -02a <br />Horsepower: 240 <br />Shift Basis: 1 . er da <br />Data Source: (CRG) <br />Utilization % <br />$49.24 <br />NA <br />$81.07 <br />100 <br />$4.31 <br />100 <br />$37.41 <br />NA <br />$172.04 <br />$172.04 <br />Selected estimating method: Area <br />NA Bank Volume: NA BCY NA <br />4.50 acres Rip Depth (ft): 1.50 Volume: 10,890 <br />Source of estimated quantity: Based on obervations durin Au ust 29, 2013 Ins ection <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: NA <br />Area: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />Site Altitude: <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production- <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Unit cost: $274.658 Per acre <br />2.45 <br />6.50 <br />500.00 <br />88.00 <br />0.25 <br />0.755 <br />0.755 <br />5,930 <br />1.00 <br />0.83 <br />0.83 <br />0.63 <br />0.63 <br />Total job time: <br />Total job cost: <br />feet/second <br />mph <br />degrees <br />feet <br />feet <br />feet <br />acresihour <br />Acres/hr <br />feet <br />(CAT HB) <br />(1 shift day) <br />multiplier <br />Acres/hr <br />Acres/hr <br />7.18 <br />$1236.00 <br />BCY or CCY <br />Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.