Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 05A Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />MEEKER <br />Total one -way travel distance: <br />12.00 miles <br />Average Travel Speed: <br />40.00 mph <br />Total <br />Non - Roadable Mob /Demob Cost <br />`* two round trips with haul rig: <br />53,041.38 <br />Total Roadable Mob /Demob Cost ** <br />** one round trip, no haul rig: <br />$39.35 <br />Transportation Cycle Time: <br />Non - Roadable Roadable <br />Equipment <br />_ Equipment <br />Haul Time (Hours): <br />0.30 0.30 <br />Return Time (Hours): <br />0.30 0.30 <br />Loading Time (Hours): <br />0.50 NA <br />Unloading Time (Hours): <br />0.50 NA <br />Subtotals: <br />1.60 0.60 <br />JOB TIME AND COST <br />Total job time: <br />3.20 Hours <br />Total job cost: <br />$3,080.73 <br />CIRCES Cost Estimating Software <br />