My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-03_REVISION - M2000073
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000073
>
2013-09-03_REVISION - M2000073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:27 AM
Creation date
9/11/2013 7:16:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000073
IBM Index Class Name
REVISION
Doc Date
9/3/2013
Doc Name
FW Increase
From
DRMS
To
XTO Energy Inc.
Type & Sequence
SI1
Email Name
THM
GRM
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagel of 2 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilization <br />Site: Shults Gravel Pit Permit Action: SI -01 Permit/Job . M2000073 <br />PROJECT IDENTIFICATION <br />Task #: 05A State: Colorado Abbreviation None <br />Date: 932013 County: Rio Blanco Filename: M073 -05a <br />User: THM <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Shift basis: 1 leer da, <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: a <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine Weight/ <br />Owner ship <br />Haul Rig <br />Fleet Haul Trip <br />Return Trip <br />DOT Permit <br />Description Unit <br />Cost/hr/ unit <br />Cost/hr unit <br />Size Cost/hr <br />Cost/hr fleet <br />Cost/ fleet <br />(TONS <br />fleet <br />Cat D711 DS Series 34.57 <br />$44.66 <br />$117.55 <br />1 $162.21 <br />$117.55 <br />$250.00 <br />II LGP <br />Cat 637G w push- 59.59 <br />$100.38 <br />$125.45 <br />1 $225.83 <br />$125.45 <br />$250.00 <br />ull <br />Drill Broadcast 25.00 <br />$39.59 <br />$88.67 <br />1 $128.26 <br />$88.67 <br />$250.00 <br />Seeder with Tractor <br />Subtotals: $516.30 <br />$331.67 <br />$750.00 <br />ROADABLE EOUIPMENT: <br />Machine Description Total Cost/hr unit Fleet Size Haul Trip Return Trip <br />Cost/hr fleet Cost/hr fleet <br />Flatbed Truck. 4x2, 30K GVW $32.79 2 $65.58 $65.58 <br />Subtotals: $65.58 $65.58 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.