Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 08A Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one -way travel distance: <br />Average Travel Speed: <br />Total Non - Roadable Mob /Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob /Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />2.25 <br />2.25 <br />2.25 <br />2.25 <br />0.50 <br />NA <br />0.50 <br />NA <br />5.50 <br />4.50 <br />Total job time: <br />Total job cost: <br />GRAND JUNCTION <br />90.00 miles <br />40.00 mph <br />$10,186.44 <br />$271.17 <br />11.00 Hours <br />$10,457.61 <br />CIRCES Cost Estimating Software <br />