Laserfiche WebLink
August 27,2013 C-1992-080/Carbon Junction Mine MLT <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> Infraction Number: CV2013005 <br /> Inspection Date: April 30, 2013 <br /> Date Issued: May 28, 2013 <br /> Primary Topic: Hydrologic Balance <br /> Secondary Topic: <br /> Tertiary Topic: <br /> Description: Failure to Minimize Damage to the Prevailing Hydrologic Balance within <br /> the Permit Area. <br /> Abatement#: 1 <br /> Abatement Due Date: 7/1/2013 <br /> Abatement Due Extended Date: 9/12/2013 <br /> Abatement Description: <br /> Submit a complete Technical Revision to the permit that accurately represents the as- <br /> built configuration of the Carbon Junction Permanent Diversion, with supporting design <br /> details per Rule 4.05.3. This revision shall also include an updated, accurate post- <br /> mining topography map for the entire permit area and a map delineating the Carbon <br /> Junction drainage area. <br /> Abatement#: 2 <br /> Abatement Due Date: 7/1/2013 <br /> Abatement Due Extended Date: 9/12/2013 <br /> Abatement Description: <br /> Submit a complete Technical Revision to the permit that presents designs and plans for <br /> reestablishment of the Upper Carbon Junction Channel, including the un-named <br /> tributary that enters the drainage from the east, and reclamation and stabilization of the <br /> Carbon Junction Temporary Diversion and gully erosion. [The Upper Carbon Junction <br /> channel segment runs from the undisturbed channel upstream of the North Pit down to <br /> the beginning of the rip-rapped Carbon Junction Permanent Diversion, a distance of <br /> approximately 1900 feet.] <br /> Abatement#: 3 <br /> Abatement Due Date: 8/21/2013 <br /> Abatement Due Extended Date: 11/22/2013 <br /> Abatement Description: <br /> Repair and stabilize the gully erosion that has formed in the Carbon Junction Temporary <br /> Diversion, according to the approved plan required by Abatement Step 92. <br /> Abatement#: 4 <br /> Abatement Due Date: 8/21/2013 <br /> Abatement Due Extended Date: 11/22/2013 <br /> Abatement Description: <br /> Reestablish the Upper Carbon Junction Channel, including the un-named tributary that <br /> enters the drainage from the east, according to the approved plan required by Abatement <br /> Step 92. <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 0 Page 4 of 8 <br />