Laserfiche WebLink
• Finger Rock Pipelines. Non-consumptive for fish hatchery. (not modeled) <br />• Moore Park Creek (Elgin Ditch) (not modeled) <br />• Lives largely on return flows from Lindsey, Big Mesa and C.A. Leighton <br />ditches. <br />• Elvis can dry up stream at the Fix Ditch. Return flow from Elgin can make a <br />stream. <br />• Most of return flows from Buckingham Mandall, Mandall, Acton and Fix <br />ditches go to Phillips Creek. <br />• Pennsylvania return flows below Town of Yampa. <br />• Bird and Nickel return flows above Egeria Ditch. <br />• Allen Basin Supply Ditch: <br />• Diverts from Mill Creek. Delivers transbasin to Allen Basin Reservoir. <br />• Not much water. Only diverts in spring runoff before direct flow rights are in. <br />• Boor Ditch is not used much. It is a small carrier ditch from So. Hunt Creek to <br />Mill Creek above the Allen Basin Supply Ditch. (not modeled) <br />• Lafone Ditch is the last calling right on So. Hunt Creek. <br />• Collins Ditch and the Simon Ditch are the major rights on Middle Hunt <br />• Rossi No. 1 is higher on Middle Hunt Creek but is not used much. (not <br />modeled) <br />• North Hunt Creek: <br />• The Sage Hen Ditch is above the N. Hunt Creek Ditch <br />• Return flows from High Mesa and Sage Hen are intercepted by N. Hunt Crk <br />Ditch. <br />• Allen Basin Reservoir: <br />• Water delivered to Simon, Collins and Reservoir Ditch (a carrier ditch). <br />• Reservoir Ditch carries to Bull Ck. Ditch, Mill Creek Ditch and Lateral A <br />Ditch. <br />• North Hunt Creek Ditch can dry up No. Hunt Creek; Collins can dry up <br />Middle Hunt Creek and Lafone Ditches can dry up South Hunt Creek. <br />• Oakton Ditch gets a lot of return flow directly from tailwater out of Egeria <br />Ditch. <br />• Union Ditch was inundated by Stagecoach Reservoir and is not used much <br />except for Stagecoach mitigation plan. <br />• Stagecoach hydropower: <br />• Up to 115 cfs can be released for hydro. >115 cfs goes over spillway. <br />• Typically run at minimum 40 cfs for power generation. (This was not <br />implemented.) <br />Yampa River Basin Information 3-14 <br />