Laserfiche WebLink
Remaining irrigation season well depletions should be replaced with a bypass of a portion of <br />the Upper Platte & Beaver Canal direct flow water. Operation of a bypass requires <br />maintenance of historical return flows, which should be added to the well depletion Plan <br />structure demand (ID 0102529). <br />A-52 ofA-106 <br />