Laserfiche WebLink
Table 2 <br />Upper Platte & Beaver Canal Augmentation Plan Structures (Plan ID 0102529) <br />Component WDID Comment <br /> Plan ID used to track total pumping, depletions, and water <br />Augmentation Plan 0102529 supplies. Water supplies include natural stream flow if the <br /> downstream call is junior or no call is active. <br />Recharge Site 0100515 Rch Reservoir ID used to store diversions to a Recharge site. <br />Recharge Seepage 0102529 <br />P1R Plan ID used to track lagged accretions from Recharge site <br /> _ see a e. <br />Canal Seepage 0102529 <br />P1C Plan ID used to track lagged accretions from canal <br /> _ seepage. <br />Direct Right Bypass 0100515 Diversion ID used to replace depletions by direct bypass <br /> of ortion of direct flow ri ht. <br />Lagged accretions to the South Platte River from recharge diversions are returned to the river <br />based on return flow factors and locations defined in StateMod input files. Lagged accretions <br />should be accounted in recharge accretions structures based on source of seepage water - <br />recharge site seepage (ID 0102529_P1R) or canal seepage (ID 0102529_P1C), as summarized in <br />Table 2. Canal seepage should be accounted based on simulated ditch losses from all diversions <br />to recharge when no other supplies (e.g., irrigation) are being run in the ditch. <br />One recharge water right is used to divert water from the South Platte River into the ditch and <br />multiple recharge sites (pits) off the Upper Platte & Beaver Canal. The capacity of the ditch and <br />number and capacities of the pits able to store recharge water is unknown; therefore, the demand <br />for the recharge water rights should be modeled at one recharge site located at the end of the <br />Upper Platte & Beaver Canal, as summarized in Table 3. <br />Table 3 <br />Upper Platte & Beaver Canal Augmentation Plan Recharge Water Rights <br />i <br />Di <br />h <br />C Recharge Site at end of Capacity / Su 1 <br />arr <br />er <br />tc Ditch Target Amount Admin. No. App. Date <br />Upper Platte & Upper Platte & Beaver <br />Beaver Canal Canal Recharge Area 14,400 ac-ft* 234.17 cfs 44723.0 6/12/1972 <br />(ID 0100515) (ID 0100515 Rch) <br />* Equal to 234.17 cfs * 1.9835 ao-ft/dy/cfs * 31 days <br />Augmentation Plan Operations <br />Operating rules to replace river depletions from well pumping include the following in order of <br />use: <br />1. Well depletions (stored under plan ID 0102529) should be replaced year-round by natural <br />flows when in priority, i.e., when no downstream call or when downstream call is junior to <br />common priority date of June 7, 1969 (admin. no. 43622.0) used for wells in Upper Platte & <br />Beaver augmentation plan. <br />2. Well depletions (stored under plan ID 0102529) should be replaced year-round with available <br />recharge accretions from canal seepage (stored under plan ID 0102529_P1C) and recharge <br />seepage (stored under plan ID 0102529_P1R). <br />A-51 ofA-106 <br />