Laserfiche WebLink
<br />Construction <br />~ Bulletin <br /> <br />M <br />o <br />90lume 4, No. 1 <br /> <br />Yc u'~--:fc. .- r <br /><Z '( <br />G-v Un, r- ftp-=- <br />(..,.--.;/11-'7(.)'.M- <br />Grand Valley Unit <br />Colorado River Basin Salinity Control Project <br /> <br />a fact sheet on construction of <br />Middle Government Highline laterals A34-A40 <br /> <br />prepared by the Bureau of Reclamation <br /> <br />April 1992 <br /> <br /> <br />View of delivery assembly with a double valve scheme under construction, The earth has been compacted <br />around the assembly piping and before completion, a concrete pad will be placed around the pipe, <br />(Bureau of Reclamation photo by David Gates) <br /> <br />CONSTRUCTION UNDERWAY ON MIDDLE GOVERNMENT HIGHLlNE <br />LA TERALS A34.A40 <br /> <br />In November 1991, MA Concrete Construction, <br />Inc., Fruita, Colorado was awarded the contract <br />for construction of Laterals A34-A40 located <br />north of Fruita. <br /> <br />approximately 42,000 feet of 6- to 36-inch <br />diameter pipe as of late February. <br /> <br />In late November, M.A. Concrete began install- <br />ing pipe for Lateral A36. They have installed <br /> <br />All four of the lateral turnout structures on the <br />canal will be completed prior to the Grand Valley <br />Water Users' Association turning water into the <br />canal. The contractor expects to have Laterals <br />