My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00614
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00614
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:26:54 PM
Creation date
10/11/2006 9:51:14 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.D
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
8/30/1994
Title
CWCB Agenda Item 17(d) - Sept. 13-14-1994-Board Meeting - Glen Canyon Operations - Spike Flow Issues
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver. Colorado 80203 <br />Phone (303) 866-3441 <br />FAX (303) 866-4474 <br /> <br />STATE OF COLORADO <br /> <br />o <br /> <br />Roy Romer <br />Governor <br /> <br />MEMORANDUM <br /> <br />James S. Lochhead <br />Executive Director, DNR <br /> <br />Daries C. Lile, P.E. <br />Director, CWCB <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br />Chuck Lile ~r <br /> <br />.- <br />,. <br />~ <br />, <br />., <br /> <br />FROM: <br /> <br />DATE: August 30, 1994 <br /> <br />SUBJECT: Agenda Item 17(d), September 13-14, 1994, Board Meeting -- <br />Glen Canyon Operations - Spike Flow Issues <br /> <br />Presently the proposed spike flow release from Glen Canyon Dam is planned for in April 1995, and <br />the annual Operating Plan for the Colorado River and Glen Canyon Dam is being designed to allow <br />for the moving of a block of water into April. This means that beginning in October 1994 <br />adjustment will be made in the amount of releases from Lake Powell on a monthly basis to <br />accumulate enough water for the release in April. <br /> <br />We still continue to raise opposition to the release for two reasons: 1) we believe, and the Attorney <br />General's Office concurs, as well as several of the basin states and the power users that this release <br />is a violation of the Law of the River, and 2) that there will be severe environmental impacts in the <br />Grand Canyon to endangered species as well as other Canyon resources which have not been fully <br />analyzed, nor has the Bureau of Reclamation met proper NEP A and ESA compliance. <br /> <br />At the cooperating agency meeting recently held in Phoenix, the Bureau's attorney, Robert Moller, <br />reported in his opinion that the release was legal, but that he has advised his client that a legal <br />determination through the court process was not without a down side and that it was not necessarily <br />a given that they would prevail. He did not issue a formal written legal opinion. <br /> <br />Additionally, staff of the U.S.B.R. reported that there will not be enough water in Lake Powell under <br />present hydrological forecast to allow for an elevation in the reservoir sufficient for release from the <br />spillway gate, and consequently the bypass amount would need to be in the range of 42,000 cfs, <br />rather than 52,000 cfs. This raised an issue as to the value of the data being collected since the flow <br />would be less, however, 42,000 cfs would still exceed the 32,000 cfs capacity of the power plant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.