<br />000938 <br /> <br />I<oss'D <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />File <br /> <br />November 18, 1996 <br /> <br />FROM: <br /> <br />Meg Frantz <br /> <br />SUBJECT: <br /> <br />November 14, 1996 Progress Meeting <br /> <br />Attendees: <br /> <br />. Ray Bennett, SEO <br />. Ray Alvarado, CWCB <br />. Gene Jencsok, CWCB <br />. Jerry Kenny, Boyle <br />. Roger Sonnichsen, Boyle <br />. Meg Frantz, Boyle <br /> <br />Introduction <br /> <br />The meeting was held at Boyle's office with the above-listed people in attendance. Objective was to <br />review progress with the Yampa River basin model. Please contact Meg Frantz if you believe the <br />following to be incorrect. <br /> <br />Project schedule <br /> <br />Jerry Kenny presented a revised project schedule which called for completing the Phase IlIa contract by <br />August 31,1997. Ray Bennett stated that he needs to see ending dates that reflect Boyle's final <br />submittal, including revisions responsive to the State's review, rather than draft final submittals. He was <br />also concerned that: <br /> <br />. working concurrently on three basins is unrealistic <br /> <br />. submitting draft final reports on two basins at the same time burdens the State with concurrent <br />review of two basins . <br /> <br />. software may not be ready by the time Boyle undertakes the second basin model <br /> <br />After lengthy discussion, it was concluded that Boyle should develop a revised schedule that meets the <br />following constraints and/or conditions: <br /> <br />. contract period may extend to November 30, 1997 <br /> <br />. approximately the month of December, 1996 will be available for Rti to work on software <br />problems identified during the Yampa River model enhancement <br /> <br /><<logo here>> <br />