My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00253
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00253
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
10/5/2006 11:45:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153579
Contractor Name
Highline Buzzard Ditch Company
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 90-41
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /><! <br /> <br />. <br /> <br />. <br />STATE OF COLORADO <br /> <br />Department of Natural Resources <br /> <br />o <br /> <br />COLORADO WATER CONSERVATION BOARD <br /> <br />721 Slate Cenlennial Building <br />1313 Sherman Street <br />Denver. Colorado 80203 <br />PhOne ~303J 86b-344 1 <br />FAX (303) 860-4474 <br /> <br />Roy Romer <br />Govemor <br /> <br />December 2, 1993 <br /> <br />DariesC.LJIe. P.E <br />Director. eweB <br /> <br />Mr. Arza L. Mills, President <br />Highline-Buzzard Ditch Co. <br />RT-l, Box K-18 <br />Collbran, CO 81624 <br /> <br />RE: <br /> <br />Highline-Buzzard Ditch Co. <br />Initial Loan Approval <br /> <br />Dear Mr. Mills, <br /> <br />Concerning your application for a loan from the Construction Fund, I am pleased to <br />inform you that the eweB Board has granted initial approval of your request in amount <br />of $50,000 for the construction project. The CWCB Board also approved a loan term of 30 <br />years at an interest rate of 4%, It is our understanding that these funds will be used to place <br />approximately 3000 feet of ditch in pipeline. I have attached a copy of my updated CWCB <br />Board memo concerning the Highline-Buzzard bitch Company. Please refer to page 2 of <br />that memo and to the section "Action Taken by the CWCB Board". <br />The Construction loan will be considered by the State General Assembly as part of <br />the 1994 Construction Fund Bill, with passage expected in June 1994. Funds will be <br />available about 60 days after that date, once the contract between the Ditch Company and <br />the State has been finalized. <br /> <br />The CWCB Board required that the loan be contingent upon our receipt of the SCS <br />Feasibility Study/Cost Estimate, and the Plans and Specifications. When available, these <br />items should be sent to me for inclusion in your loan file. <br /> <br />On behalf of the CWCB Board, I would like to thank you for applying for a <br />Construction Fund Loan from the Colorado Water Conservation Board. <br /> <br />~iincereIX' <br />( ! (; ( -- <br /> <br />\ J. ohn ~n Sciver, P.E. <br />.......~-,.-'/ Colorado Water Conservation Board <br /> <br />Attachment <br /> <br />cc:Mr. Tyler Martineau, Member CWCB Board <br /> <br />c:\ WP51\ge1l9.1tr <br />
The URL can be used to link to this page
Your browser does not support the video tag.