Laserfiche WebLink
<br />. .. <br /> <br />REPORT TO STATE COORDINATOR FOR COLORADO AWRBIAC <br /> <br />By <br />HYDROLOGY AN]) SEDIMENTAtION SUBCOMMITTEE <br /> <br />The sixteenth meeting ot the Hydrology and Sedimentation Subcommittee <br />in oonneotion with State ooordination AWRBIAC, was held in Denver, Col~rado.. <br />October 6, and 7, 19,4 in .the oUices of the Colorado Water Conservation <br />Board. <br /> <br />The follOWing members or representatives attended the meetings': <br /> <br />L. T. Burgess, Colo. State Engineer IS Office, Denver, Colorado <br />Franois !II. Bell, U. S. Geological Survey, Denver, Colorado <br />S. W. Lohman, u. S. Geological Survey, Denver, Colorado <br />Hans Kramer, B!'ig. Gen" USA, (Ret), Arkansas River Compact Adm..,. <br />San FranCisco, California <br />W. G. Sutton, Corps of Engineers, Albuquerque, New Mexico <br />J. L. Redmond, Corps of Engineers, Albuquerque, New Mexico <br />John T. Martin, Corps of Engineers, Albuquerque, New Mexico <br />J. H. Dorroh. Jr., Soil Conservation Service, Albuquerque. New MeXioo <br />R. M. ,Gildersleeve, Colo. Water Cons. Board, Denver, Colorado <br />W. R. Seaman, Colorado Game & Fish Dept., Denver, Colorado <br />J. M. Rosa, Forest service, Ogden, Utah <br />A. B. Eustis, Fish & Wildlife Service, Denver, Colorado <br />Kenneth E. Ireland, Bureau of Reclamation, Pueblo, Colorado <br /> <br />No amendments or corrections to minutes of the previous meeting wete <br />submitted. <br /> <br />Chairman Gildersleeve stated that the meeting had been called to consider <br />hydrologic studies for proposed programs and projects as follows: <br /> <br />Upstream Flood Prevention - Fountain River <br />Upstream Flood Prevention -Arkansas River above Pueblo <br />Wolf Creek Reservoir <br />Granada Reservoir Project <br />Arkansas ValleY Drainage and Flood Control Project. <br /> <br />Mr. Rosa was asked to begin the presentation. <br />