Laserfiche WebLink
<br />. <br /> <br />M _f'...t1_Q..B...Lf.\LR_."L.t1. <br /> <br />TO: <br />FROM: <br /> <br />8i11 Stanton <br />l.arry Lan~l /....rU <br /> <br />DATE: <br /> <br />January 31, 1990 <br /> <br />SUBJECT: Amendments to the Crook Flood Control Levee Plans <br />and Specifications, Phase I, MEC Project No. 8708 for <br />the South Platte Levee Project <br /> <br />As you are aware, a portion of the levee system was <br /> <br />constructed in 1988. A phase II for the project will be bid in <br /> <br />the Spr'ing, 1990. The phase II bid documents will consist of <br /> <br />bid schedules I and II. Schedule I will be prepared by ARIX <br /> <br />and include all the drawings and specifications for the <br /> <br />construction of the Crook drainage ditch. Schedule II will <br /> <br />include the placement of the excavated drainage ditch materials <br /> <br />in the levee system between stations 82 + 00 to 147 + 15. The <br /> <br />Mu11er Engineering Company has prepared the construction <br /> <br />drawings and specifications for schedule II. These drawings <br /> <br />and specifications need to be amended to show the 1988 <br /> <br />construction between stations 82 + 00 to station 122 + 50. In <br /> <br />addition, between station 82 + 00 to station 117 + 50 a survey <br /> <br /> <br />error exists for the natural ground line which is the base <br /> <br />elevation for the levee sections. These levee sections are <br /> <br />shown on sheet 13 of 15 of the Muller plans. I request that <br /> <br />you direct or prepare the following plan modifications for <br /> <br />Sc hedule II. <br /> <br />1848E* <br /> <br />r;. <br />