Laserfiche WebLink
<br />. <br /> <br />From Station 82 + 00 to Station 117 + 50. redrawn or amend <br />the cross sections to sholAJ "As constructed" conditions; <br />computed levee quantities to bring the levee to the design <br />elevation as shown on sheets 7 of 15 and 8 of 15; and prepare <br />an addendum to the Muller Engineering Specification No. 8708. <br /> <br />I have the "As constructed" 'information and mylars which <br />you will need for your investigations. I need these tasks <br />completed by February 15. 1.990. <br /> <br />Thanks! <br /> <br />LFL:dbr <br />cc: David Walker <br />