My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04418
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04418
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:46:10 PM
Creation date
10/5/2006 12:38:40 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Stream Name
South Platte
Basin
South Platte
Title
Union Avenue Boat Drop - Project Proposals, Contract Info & Billing Invoices - Part 1
Date
1/1/1983
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />,~ <br /> <br />. <br /> <br />. <br /> <br />UNION A VENUE DAM <br />MODIFICATIONS <br /> <br />CONCEPTUAL ENGINEERING <br /> <br />SCOPE OF WORK <br /> <br />Professional engineering services have been provided under verbal <br />authorization of Mr. David Walker, CWCB, to perform additional conceptual <br />level engineering pertaining to modifications to the existing dam structure <br />and river channel for boating safety of the South Platte River at the Union <br />Avenue Dam seven miles downstream of Chatfield Reservoir. <br /> <br />Items of authorized work are divided into Phase A work performed between <br />July 27, 1988 and August 22, 1988, and Phase B work performed between <br />August 23, 1988 and September 23, 1988. Specific work items are listed <br />below: <br /> <br />I. CONCEPTUAL DESIGN <br /> <br />A. Phase A <br /> <br />This phase encompasses the work authorized and performed prior <br />to the August 22. 1988 meeting of interested governmental <br />agencies. The services included: <br /> <br />1. Consultation with the CWCB defining and clarifying the <br />project requirements. <br />2. Preparation of an array of alternate configurations fitting <br />the criteria established in consultation with the CWCB. <br />3. Meetings and consultation with Urban Drainage and Flood <br />Control District, City of Englewood. CWCB, City of Sheridan <br />and the USACE concerning the prepared alternatives. <br />4. Modifications to the alternates based on input from the <br />meetings. <br />5. Presentation of the alternates at a meeting of project <br />sponsors and advisors for the selection of the final <br />alternate and guidance in desired modifications to that <br />alternate. <br /> <br />B. Phase B <br /> <br />This phase includes all work performed between the August 22, <br />1988 meeting and the September 23. 1988 presentation to the CWCB <br />board as authorized. The services performed include: <br /> <br />1. Field instrument surveying of the South Platte River channel <br />downstream of the Union A venue Dam structure for the <br />determination of the extent of sedimentation. deposition. <br />and channel degradation occurring post construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.