My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00903
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00903
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:07 PM
Creation date
10/4/2006 6:45:36 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/26/2000
Description
CF Section - Changes in Existing Loans - Ute Water Conservancy District - Plateau Creek Pipeline
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />\ <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conseroation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone, (303) 866-3441 <br />FAX; (303) 866-+174 <br /> <br />~ <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br /> <br />TO: <br /> <br />Greg E.Walcher <br />Executive Director <br /> <br />FROM: <br /> <br />Colorado Water Conservation Board Members <br />~ter H. Evans <br />a CWCB Director <br />Bill Green, P.E" Water Supply Planning and Finance Section <br />Mike Serlet, P,E" c~rer Supply Planning and Finance SectioRan McAuliffe <br />Deputy Director <br /> <br />January 18,2000 <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br />Agenda Item 11 r., January 26-27, 2000 Board Meeting - Water, <br />Supply Planning and Finance - Changes in Existing Loans - Ute <br />Water Conservancy District - Plateau Creek Pipeline <br /> <br />Introduction <br /> <br />The Ute Water Conservancy District of Grand Junction (District), acting by and through <br />the Ute Water Activity Enterprise, is requesting an additional $10,0 million in funding for <br />the District's Plateau Creek Pipeline Replacement Project. The District has two existing <br />authorizations for this project totaling $17,6 million. Please see the attached Project <br />Suinmary and map and a letter from Larry Clever, the General Manager of the District, <br /> <br />Backl!round <br /> <br />The initial feasibility study for the project wi:lS completed in October of 1987 at which <br />time the cost was estimated at about $16,7 million, The preliminary project design and <br />$16,7 million cost estimate were presented to the Board in December of 1987, The Board <br />recommended a loan of$8.0 million from the Construction Fund for about 50 percent of <br />total project costs, as subsequently authorized in SB 88-30, <br /> <br />Since 1987, a nwnber of studies and permitting docwnents have been completed for this <br />project as listed on the attached Project Summary Sheet. All required permits have been <br />obtained including the Bureau of Land Management Right-of- Way Permit, the Corps of <br />Engineers 404 Permit and Section 7 Consultation with the U,S. Fish and Wildlife Service. <br /> <br />At the November 1998 Board meeting, the Board recommended an additional increment <br />of $9,60 million for the project as subsequently authorized in an amendment to SB 88-30 <br />and in SB 99-173, At that time, the cost of the project was estimated at $35.2 million, <br />The $9,6 million increase was intended to continue to provide 50 percent CWCB funding <br />
The URL can be used to link to this page
Your browser does not support the video tag.