My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00903
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00903
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:07 PM
Creation date
10/4/2006 6:45:36 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/26/2000
Description
CF Section - Changes in Existing Loans - Ute Water Conservancy District - Plateau Creek Pipeline
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />based on the $35,2 million cost estimate, Seven million of the $9.6 million was <br />authorized from the Perpetual Base Account of the Severance Tax Trust Fund, <br /> <br />Proiect Undate <br /> <br />Unexpected delays in bidding, a new 10,000-foot long tunnel and the fact that earlier cost <br />estimates did not take into account construction difficulties in environmentally sensitive <br />areas have all resulted in a substantial increase in costs in the last two years. The final <br />cost is now estimated at $55,360,000 as summarized in Table 1. <br /> <br />Table 1. Plateau Creek Pipeline Cost Summary <br /> <br />Planning and permitting $2,500,000 <br />Design engineering 2,300,000 <br />Easements and rights of way , 150,000 <br />Phase I pipeline construction 2,720,000 <br />Other costs 225,000 <br />Sub-total to date $7,895,000 <br />Phase II pipeline construction (bid amount) 44,200,000 <br />Phase II engineering, inspection and other costs 3,265,000 <br />Total estimated project cost $55,360,000 <br /> <br />The first phase of the project involved 1.5 miles of pipeline and was completed in May <br />1999. The second and final phase consists of about 13 miles of pipeline and two long <br />tunnels, Project completion is scheduled for October of2001. To date, the District has <br />spent about $7,9 million for planning, permitting, engineering, rights of way and <br />easements and construction. Remaining project costs are estimated at $47,5 million, <br /> <br />The following information was, for the most part, presented in the staffs memos to the <br />Board ofMav and November 1998, The Sources of Funding and Financial Summary <br />sections have been updated based on information recentlv provided bv the District. The <br />Discussion and Recommendation sections have been revised to address the new funding <br />reouest. <br /> <br />Proiect Snonsor <br /> <br />The District service area encompasses about 240 square miles in the Grand Junction <br />metropolitan area with the exception of about seven square miles served by the City of <br />Grand Junction and several smaller communities, Table 2 gives some selected <br />characteristics of the District. <br /> <br />2 <br /> <br />---'- <br /> <br />, <br />I <br /> <br />,~ <br /> <br />. <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.