My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayfield Xeriscape Ed Contract
CWCB
>
Water Conservation
>
Backfile
>
Bayfield Xeriscape Ed Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2011 1:24:54 PM
Creation date
9/30/2006 9:04:33 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Ag/Muni Grant
Contract/PO #
C153619
Applicant
City of Bayfield
Project Name
Bayfield Elementary School Xeriscape Education Project
Title
Contract
Date
7/1/1992
County
La Plata
Water Conservation - Doc Type
Contract
Document Relationships
Bayfield Xeriscape Ed Applic
(Message)
Path:
\Water Conservation\Backfile
Bayfield Xeriscape Ed Final Report
(Attachment)
Path:
\Water Conservation\Backfile
Bayfield Xeriscape Ed Ltr
(Attachment)
Path:
\Water Conservation\Backfile
Bayfield Xeriscape Ed WorkPlan
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~. <br /> <br /> <br />CONTRACT ROUTrNG NUM <br /> <br /> <br />3 <br /> <br />CONTRACT <br /> <br />THIS CONTRACT. made this ~ day of l!:!h. 1992, by and between the State of Colorado for the use and benefit of the Department of Natural <br />Resources, Colorado Water Conservation Board, 1313 Shennan St. Room 721, Denver, Colorado 80203 hereinafter referred to as the Sta~ a~~ChOOl (f.%c.5 <br />~.O.;:~~ Rayfield, Colorado, &1122, hereinafter referre<! to as the Conrractor. I-"~~ ~ <br /> <br />t:I:= j-OJ WHEREAS, authority existS in the Law and Funds have been budgeted, appropriated and otherwise made available and a sufficient unencumbered <br />balance there of remains available for payment in Agency PDA. Fund Number 462, Organization r;nyy, Appropriation Code 100. Program WTRC, Object Code <br />5110, Sub Object Code~, Contract Encumbrance Numbe--;[1....J 5.3 (0 I ~and <br /> <br />WHEREAS, required approval. clearance and coordination has been accomplished from and with appropriate agencies; and <br /> <br />WHEREAS. the State desires to assist public agencies, established under Colorado law, for the purpose of a pllot program demonstrating the <br />benefits of water efficiency measures by providing incentive grants pursuant to the authority granted in Section 37-60-125, CRS: and <br /> <br />WHEREAS, the Contractor's application for a grant from the Water Conservation Board Construction Fund has been received and approved by <br />the Colorado Water Conservation Board; and <br /> <br />WHEREAS, the Colorado Water Conservation Board desires to distribute said funds pursuant to law; and <br /> <br />WHEREAS, the Contractor is an eligible public agen<:y to receive grant assistance from the Pilot Program for demonstrating the benefits of water <br />efficiency measures. <br /> <br />NOW THEREFORE it is hereby agreed that: <br /> <br />1. Area Covered. The Contractor shall perform and accomplish all the necessary work and services provided under this Contract, as described <br />in the attached Exhibi.t A, wm<:.h is incorporated herein and made part of this Contract by reference. <br /> <br />2. Scope of Services. In consideration for the mtmies to be received from the State, the Contractor shall do, perform, and carry out, in a <br />satisfactory and proper manner, as determined by the State, ~ work elements as indicated in the "Scope of Services", set forth in the attached Exhibit A, <br />hereinafter referred to as the "Project" and incorporated herein. W (lI"k performed prior to the execution of this Contract sha.ll not be considered part of this Project. <br /> <br />3. Responsible Administrator. The performance of the services required hereunder shan be under the direct supervision of Bert Roberts, an <br />employee or agent of Contractor, who is hereby designated as the administrator~in-charge of this ProjecL If At any time the administrator-in--charge changes the <br />Board must be given written notice of the change and must approve the replacement before any further monies are distributed. <br /> <br />4. Time of Performance. Uris Contract shall become effective upon proper execution of this Contract. by the State Controller or his designee. <br />The Project contemplated herein shall commence as soon as practicable after the execution of this Contract and shall be undertaken and performed in the sequence <br />set forth in the "Time of Performance" in the attached Exhibit A. Expenses incurred by the Contractor in association with said Project prior to execution of this <br />Contract shall not be eligible expenditures. The Contractor agrees that time is of the essence in the performance of its obligations under this Contract, and that <br />completion of the Project shall occur no later than the termination date set forth in the Time of Performance in Exhibit A. <br /> <br />5. Compensation and M~thod of Payment. The State agrees to pay to the Contractor, in consideration for the work and services to be performed, <br />a total amount not to exceed SEVEN THOUSAND AND NO/lOa Dollars ( $7,000.00). The method and time of payment shall he made in accordance with <br />the "Payment Schedule" set forth in Exhibit A. <br /> <br />Page 1 of 6 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.