My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
San Miguel Guide to Basin Contract
CWCB
>
Water Conservation
>
Backfile
>
San Miguel Guide to Basin Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2011 1:47:58 PM
Creation date
9/30/2006 9:01:59 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Ag/Muni Grant
Contract/PO #
C153617
Applicant
San Miguel County
Project Name
Citizen's Water Guide to Upper San Miguel River Basin
Title
Contract
Date
6/30/1992
County
San Miguel
Water Conservation - Doc Type
Contract
Document Relationships
San Miguel Guide to Basin Applic
(Message)
Path:
\Water Conservation\Backfile
San Miguel Guide to Basin Approval Ltr
(Message)
Path:
\Water Conservation\Backfile
San Miguel Guide to Basin Final Report
(Message)
Path:
\Water Conservation\Backfile
San Miguel Guide to Basin WorkPlan
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />> <br /> <br />A <br /> <br />~ <br /> <br />CONTRACT ROUTING NUMBER <br /> <br />0'5 <br /> <br />CONTRACT <br /> <br />THIS CONTRACT. made this 30th day of ~ 1992. by and between lb. Slate of Colorado for lbo use and ben.lil of lb. IJepanment of NatunU <br />Resources. Colorado W~r Conservation Board. 1313 Sherman SL Room 721. Denver. Colorado 80203 hereinafter referred to as me State. and San Miauel <br />County. Box S48. Telluride. Colorado. 81435. hereinafter referred to as the Contractor. <br /> <br />WHEREAS,llIIbority elWts in lbe Law and Fuud" have been budseted. awropia1ed and oIbetwise made available aad a _cleo< ~ <br />balance lbere of remains aVailable for paYlIleIlt'in Asency PD.... Fund Number ~. Organization 92YY. ~ation Code 100, Prnsram WTRC, Objec% Code <br />5110, Sub Object Code Q1, Contracl Encumbrance Number C- IS" In I 7; and <br /> <br />WHEREAS. required approval, clearan<:e and coordination b.. been accomp1isbed from and with app'oprinte asellae;; and <br /> <br />WHEREAS, 1he Stale desires 10 asaist public agencies, established onder Colorado law. for lbo purpose of a pilot Jl"'ll'llDl demoosaatinS 1he <br />benefits of water efficiency measures by providing incentive grants pusuant to the amhority granted in Section 37-6()..12S. CRS; and <br /> <br />WHEREAS. the Contractor's application for a grant from the Water Conservation Board Construction Fund has been received and approved by <br />the Colorado Water Conservation Board; and <br /> <br />WHEREAS. the Colorado Water Conservation Board desires ~o distribute said funds pursuant to law: and <br /> <br />WHEREAS. the Contractor is an eligible public agency to receive grant assistance from the PIlot Program for demonstrating the benefits of water <br />efficiency measures. <br /> <br />NOW THEREFORE it is hereby agreed that: <br /> <br />1. Are;). Covered. The Contractor shall perform and accomplish all the necessary work and services provided under this Contract. as described <br />in the attached Exhibit A. which is incorporated herein and made part of this Contract by reference. <br /> <br />2. Scope of Services. In consideration for the monies to be received from the State. the Contractor shall do. perform. and carry out. in a <br />satisfactory and proper manner, as determined by the State. all work ~lements as indicated in the "Scope of S~rvices", set fonh in the attached Exhibit A. <br />hereinafter referred to as me "Project" and incorporated herein. Work performed prior to the execution of this Contract shall not be considered part of this Project. <br /> <br />3. Responsible Administrator. The performance of the services required hereunder shall be under the direct supervision of Linda Luther. an <br />employee or agent of Conttactor. who is hereby designated as the administrator-in-charge of this ProjecL If At any time the administrator-in-charge changes the <br />Board mw:t be given written notice of the change and rntm approve the replacement before any funher monies are distributed. <br /> <br />4. Time of Perfoonance. This CODttact sbaII become effective upon proper execmioD of this Contract by lbe State CoDll'OlIer or his desisnee. <br />The Project contemplated herein shall commence as soon as practicable after the execution of this Contract and shall be undertaken and performed in the sequence <br />set fonh in the "Time of Performance" in the attached Exhibit A. Expenses incurred by the Contractor in associatiOD with said Project prior to execution of this <br />Contract shan not be ~ligible expenditures. The Contractor agrees that time is of the essence in the performance of its obligations under this Contract. and that <br />completion of the Project shall occur no later than the termination date set forth in the Time of Performance in Exhibit A. <br /> <br />5. Compensation and Method of Pavrnent. The State agrees to pay to the Contractor. in consideration for the work and services to be performed. <br />a (otal amount not to ~xceed 1WENTY FIVE HUNDRED AND NOIlOO Dollars ( :'52.500.00). The method and time of payment shall be made in accordance <br />with me "PaymeR( Schedule" set fonh in Exhibit A. <br /> <br />Page I of 6 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.