My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
San Miguel Guide to Basin WorkPlan
CWCB
>
Water Conservation
>
Backfile
>
San Miguel Guide to Basin WorkPlan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2011 1:47:58 PM
Creation date
9/30/2006 9:03:05 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Ag/Muni Grant
Contract/PO #
C153617
Applicant
San Miguel County
Project Name
Citizen's Guide to Upper San Miguel River Basin
Title
Project Description
Date
5/8/1992
County
San Miguel
Water Conservation - Doc Type
Work Plan
Document Relationships
San Miguel Guide to Basin Applic
(Attachment)
Path:
\Water Conservation\Backfile
San Miguel Guide to Basin Approval Ltr
(Attachment)
Path:
\Water Conservation\Backfile
San Miguel Guide to Basin Contract
(Attachment)
Path:
\Water Conservation\Backfile
San Miguel Guide to Basin Final Report
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Project Description - to ~roduce an 8 <br />page newspaper insert ent1tled T.be <br />Citizen's water Guide to 1:he ~ san <br />HiCJUel River Basin and convene a vater <br />conference and conservation ......;hit to <br />coincide with publication. <br /> <br />GoalsjObjectives - to enhance public <br />understanding of water issues facing the <br />upper San Miguel River Basin community: <br />to provide a forum for public discuss10n <br />on the importance of water and how we <br />use it in an arid land: to promote water <br />conservation measures: to develop an <br />options paper outlining conservation and <br />water management measures appropriate to <br />this region and situation which can be <br />adopted by local government: to evaluate <br />public awareness of the water issues and <br />conservation measures: to provide a <br />model for other river basin communities <br />faced with complex water issues. <br /> <br />Project Pl..nnh'C) <br />Complete the hydrological analysis. <br /> <br />Present hydrological information in <br />vivid and coherent graphics and text. <br /> <br />Determine if the river is over-allocated <br />and analyze the implications of over- <br />allocation. <br /> <br />Submit hYdrological information to <br />advisory committee to review for <br />accuracy, clarity and usefulness. <br /> <br />Craft list of pertinent questions to be <br />answered, based on results of <br />hydrological analysis. <br /> <br />Interview water owners, developers, <br />experts, policy makers and others, using <br />the carefully crafted list of questions. <br /> <br />Summarize water augmentation plans <br />currently before the water court, other <br />water issues such as the proposed <br /> <br />Timeline <br />April 30, 1992 <br /> <br />April 30, 1992 <br /> <br />May 4, 1992 <br /> <br />June 5. 1992 <br /> <br />June 19. 1992 <br /> <br />April 22. 1992 <br />
The URL can be used to link to this page
Your browser does not support the video tag.