My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bent WC Initiative SOW
CWCB
>
Water Conservation
>
Backfile
>
Bent WC Initiative SOW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2011 1:42:36 PM
Creation date
9/30/2006 9:01:43 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Ag/Muni Grant
Contract/PO #
C153672
Applicant
Bent Soil Conservation District
Project Name
Water Conservation Initiative
Title
Bent Water Conservation Initiative
County
Bent
Water Conservation - Doc Type
Scope of Work
Document Relationships
Bent WC Initiative Approval Ltr
(Message)
Path:
\Water Conservation\Backfile
Bent WC Initiative Contract
(Message)
Path:
\Water Conservation\Backfile
Bent WC Initiative Final Report
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />;.-- <br /> <br />Bent Water Conservation Initiative <br /> <br /> TASKS AND ACTIVITIES PERSON TIMELINE MONEY <br /> . RESPONSffiLE <br />1 GOALS: <br /> 1) Demonstrate the applicability of surge <br /> technology on heavy textured soil in Bent Soil <br /> Conservation District. 2) Document the impact of <br /> surge irrigation technology on irrigation efficiency, <br /> farm economics, farm management, and p1ant-soil- <br /> water interrelationships: and develop the media <br /> resources needed to convey this information to <br /> other farm managers in southeast Colorado. 3) <br /> Evaluate the affects of surge technology on ground <br /> water resources and irrigation return flows to the <br /> Arkansas River. <br />2 TASK 1: Project Planning <br /> * Prepare BWCI Workplan WERTZ 01-10-94 <br /> * Review BWCI Workplan wI CWCB WERTZ 01-21-94 <br /> * Approve BWCI Workolan BRIDGES 01-31-94 <br />3 TASK 2: Orientation Seminar and Grant <br /> Participant Selection $40.00 <br /> * Surge Valve Orientation and CWCB Grant WERTZ 02-09-94 <br /> Review. <br /> * Presentation from CSU on Patterson Hollow <br /> Education and Demonstration Project VALIANT 02-09-94 <br /> * BWCI Sign-up MARTIN 02-14-94 to <br /> 02-28-94 <br /> * Selection of Proiect Particioants BSCD 03-07-94 <br />4 TASK 3: Project Administration <br /> *Project Administrator WERTZ 04-01-93 $3,480.00 <br /> * SCD Clerk SMITH through $1,530.00 <br /> $1,520,00 <br /> * BSCD Expenses BSCD 12-31-95 <br />5 TASK 4: Hire.SeD Techni~i3.t--: \VERTZ 03-07-94 $9,240,()() <br />6 TASK 5: Purchase of Surge Valves WERTZ 03-07-94 $15,000.00 <br />7 TASK 6: Valve Installation MARTIN 03-21-94 <br />8 TASK 7: Quantitative Evaluations (3 farms) <br /> *Pre-irrigation Survey SUTHERLAND 03-08-94 <br /> *Installation of Water Measuring Equipment MARTIN 03-21-94 4,200.00 <br /> $710.00 <br /> *Installation of Gypsum Blocks MARTIN 03-21-94 <br /> *Data Collection and Valve Operation WILSON 04-01-95 <br /> *Post-Irrigation Survey SCHLEINING through <br /> *Data Analvsis WILSON 11-01-94 <br />9 TASK 8: 1994 Activities <br /> *Reading of Gypsum Blocks SCD TECH 04-01-94 <br /> *Reading of water measuring equipment SCD TECH. through <br /> *Farmer Consultation and Documentation SCD TECH. 11-01-94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.