My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting Memorandum 09/04/2003 (A)
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Board Meeting Memorandum 09/04/2003 (A)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2014 2:25:59 PM
Creation date
9/10/2014 2:25:58 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/4/2003
Description
Non Reimbursable Projects South Platte Decision Support System (SPDSS)
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br /> IP RGa s <br /> Colorado Water Conservation Board ,f3-.), `o Itt s <br /> Department of Natural Resources 3 ` x, <br /> 1313 Sherman Street,Room 721 a t .' " <br /> Denver,Colorado 80203 °u •, <br /> Phone: 866-3441 - '<,-, -` <br /> FAX:(303)866-4474 r s 33- <br /> www.cwcb.state.co.us <br /> Bill Owens <br /> Governor <br /> MEMORANDUM Greg E.Watcher <br /> Executive Director <br /> Rod Kuharich <br /> To: Colorado Water Conservation Board Members CWCB Director <br /> Dan McAuliffe <br /> From: Randy Seaholm <br /> y Deputy Director <br /> tor <br /> Ray Alvarado <br /> Date: September 4, 2003 <br /> Re: September 22, 2003, CWCB Finance Committee Meeting <br /> Water Supply Planning and Finance—Non Reimbursable Projects <br /> IIISouth Platte Decision Support System(SPDSS) <br /> Introduction <br /> This request is for the continued implementation of the CWCB South Platte Decision Support System(SPDSS). <br /> The implementation of the SPDSS is anticipated to take 6 to 7 years. The SPDSS is currently in its second year <br /> of implementation. SPDSS is part of the CWCB long-range plan related to the CDSS effort, which is to have a <br /> decision support system for each river basin in Colorado. For FY 04-05, an appropriation of $2,000,000 is <br /> being sought from the Construction Fund to continue the CWCB SPDSS program. The SPDSS was <br /> initiated in 2001 with the approval of$2,000,000 from the construction fund. The program was again funded in <br /> 2002,with the approval of$2,000,000 from the construction fund. No funds were requested in 2003. <br /> Discussion <br /> Development of the SPDSS is being built upon the experience, databases, tools and models already completed <br /> for the CRDSS and RGDSS. The South Platte River basin, however, is a more complex river basin from <br /> hydrologic, hydrogeologic and institutional perspectives than either the Colorado River or the Rio Grande <br /> basins. Consequently, in order to produce a working SPDSS it will be necessary, in some instances, to develop <br /> new data and enhance or develop new analysis tools and models. The SPDSS will consist of data that <br /> characterize the hydrologic and hydrogeologic features of these basins and tools that provide enhanced water <br /> administration and water resource planning capabilities. The purpose of the SPDSS is to assist water users and <br /> tate officials in developing, managing and preserving the water resources of the North Platte and South Platte <br /> er basins for the people of Colorado. <br /> Flood Protection•Water Project Planning and Financing•Stream and Lake Protection <br /> Water Supply Protection•Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.